M3 Construction Plans and Documents Trade Terms  (32)

M3 Construction Plans and Documents Trade Terms (32)

9th - 12th Grade

32 Qs

quiz-placeholder

Similar activities

FUSION 360

FUSION 360

9th Grade

35 Qs

Summative in Technical Drafting 10

Summative in Technical Drafting 10

10th Grade

32 Qs

2023 midterm exam

2023 midterm exam

9th - 12th Grade

28 Qs

TICs

TICs

10th - 12th Grade

28 Qs

Technologie 3

Technologie 3

9th Grade

35 Qs

Engineering Design Process Pretest

Engineering Design Process Pretest

9th - 11th Grade

32 Qs

TLE 10 - ICT - Technical Drafting_Q2_1st Summative Test

TLE 10 - ICT - Technical Drafting_Q2_1st Summative Test

10th Grade

30 Qs

DDP Quiz #3

DDP Quiz #3

9th - 12th Grade

30 Qs

M3 Construction Plans and Documents Trade Terms  (32)

M3 Construction Plans and Documents Trade Terms (32)

Assessment

Quiz

Instructional Technology

9th - 12th Grade

Medium

Created by

John Bruchak

Used 4+ times

FREE Resource

32 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A legal right-of-way provision on another person’s property (for example, the right of a neighbor to build a road or a public utility to install water and gas lines on the property). A property owner cannot build on an area where an _______ has been identified.

Dimension Lines

Easement

Front Setback

Property Lines

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The distance from the property line to the front of the building.

Dimension Lines

Easement

Front Setback

Property Lines

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The recorded legal boundaries of a piece of property.

Dimension Lines

Easement

Front Setback

Property Lines

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Lines on a drawing with a measurement indicating length.

Dimension Lines

Easement

Front Setback

Property Lines

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A document used during the construction process that is used to clarify and resolve questions and information gaps in plans, drawings, specifications, and agreements.

Computer-Aided Drafting (CAD)

Finish Floor Elevation (FFE)

Not to Scale (NTS)

Request for Information (RFI)

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The making of a set of construction drawings with the aid of a computer.

Computer-Aided Drafting (CAD)

Finish Floor Elevation (FFE)

Not to Scale (NTS)

Request for Information (RFI)

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The uppermost surface of a floor once construction is complete and prior to any finishes or coverings being applied. It is used as a reference plane for other vertical dimensions.

Computer-Aided Drafting (CAD)

Finish Floor Elevation (FFE)

Not to Scale (NTS)

Request for Information (RFI)

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?