Plumbing level 2 - PP 3.1 - Hot water

Plumbing level 2 - PP 3.1 - Hot water

University

10 Qs

quiz-placeholder

Similar activities

Oxyacetylene Torch Cutting

Oxyacetylene Torch Cutting

10th Grade - University

10 Qs

General Food Production

General Food Production

University

15 Qs

Ch5 In Class Activity 1

Ch5 In Class Activity 1

10th Grade - Professional Development

12 Qs

Unit I Conduction Basics

Unit I Conduction Basics

University

10 Qs

T Level BSE plumbing systems

T Level BSE plumbing systems

University - Professional Development

15 Qs

Plumbing Level 2 - PP1.1 - Cold water

Plumbing Level 2 - PP1.1 - Cold water

University

10 Qs

Plumbing level 2 - PP1.3 - Central Heating

Plumbing level 2 - PP1.3 - Central Heating

University

10 Qs

T level BSE Heating

T level BSE Heating

University - Professional Development

14 Qs

Plumbing level 2 - PP 3.1 - Hot water

Plumbing level 2 - PP 3.1 - Hot water

Assessment

Quiz

Professional Development

University

Easy

Created by

Byron Morris

Used 11+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the relationship between head height and pressure in a gravity-fed hot water system?

Greater head height results in lower pressure

Head height does not affect pressure

Greater head height results in higher pressure

Pressure is constant regardless of head height

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the fullway gate valve in a hot water system?

To regulate the temperature of the water

To connect the cold feed to the CWSC

To stop the flow of water to the hot water system for maintenance

To increase water pressure

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the minimum length of the initial part of the hot distribution pipe?

600mm

300mm

450mm

500mm

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary function of the open vent pipe?

To increase water flow

To regulate water temperature

To prevent airlocks

To ensure safety in case of system overheating

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the required diameter for the open vent pipe?

25mm

15mm

18mm

22mm

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where is the thermostat placed in a hot water cylinder?

One-third of the way up the cylinder

At the top of the cylinder

In the middle of the cylinder

At the bottom of the cylinder

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is temperature stratification in a hot water cylinder?

Temperature difference between the sides of the cylinder

No temperature difference in the cylinder

Uniform temperature throughout the cylinder

Temperature difference between the top and bottom of the cylinder

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?