Plumbing Level 2 - PP1.1 - Cold water

Plumbing Level 2 - PP1.1 - Cold water

University

10 Qs

quiz-placeholder

Similar activities

WLD. 110 Cutting Processes Final Exam

WLD. 110 Cutting Processes Final Exam

University

6 Qs

Sensory Apparatus

Sensory Apparatus

University

10 Qs

AKITO PRODUCT KNOWLEADGE

AKITO PRODUCT KNOWLEADGE

KG - University

15 Qs

ASVAB Mechanical Comprehension/ Automotive & Shop Informatio

ASVAB Mechanical Comprehension/ Automotive & Shop Informatio

University - Professional Development

10 Qs

Avengers Aptitude

Avengers Aptitude

University - Professional Development

15 Qs

Plumbing level 2 - PP1- Central Heating

Plumbing level 2 - PP1- Central Heating

University

10 Qs

Hydraulics week 7 2.0

Hydraulics week 7 2.0

University

15 Qs

Plumbing Level 2 - PP1.1 - Cold water

Plumbing Level 2 - PP1.1 - Cold water

Assessment

Quiz

Professional Development

University

Medium

Created by

Byron Morris

Used 66+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does WRAS stand for?

Water Regulation and Standards Scheme

Water Regulation and Safety Scheme

Water Regulation Advisory Scheme

Water Regulation Association Scheme

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which British Standard covers the design, installation, testing, and maintenance of water systems?

BS8000 pt15

BS6700

BS6000

BS7000

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the minimum size of the vent pipe according to BS6700?

32mm

22mm

15mm

28mm

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In a centralised stored hot water system, where is the hot water cylinder commonly located?

In an airing cupboard

In the bathroom

In the attic

In the kitchen

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary function of the open vent in an open vented system?

To heat the water

To filter the water

To act as a safety relief valve

To increase water pressure

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the minimum size of the cold feed pipe according to BS6700?

32mm

15mm

22mm

28mm

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of system uses a combination boiler to heat water on demand?

Localised hot water

Centralised instantaneous hot water

Direct hot water cylinder

Centralised stored hot water

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?