CI-LO2 - Stages of Construction - True or False

CI-LO2 - Stages of Construction - True or False

12th Grade

34 Qs

quiz-placeholder

Similar activities

Tissue Identification

Tissue Identification

11th - 12th Grade

30 Qs

The Basic Checklist

The Basic Checklist

9th - 12th Grade

30 Qs

Principles of Manufacturing  - Spring TEKS Review -23 - 2nd

Principles of Manufacturing - Spring TEKS Review -23 - 2nd

9th - 12th Grade

30 Qs

Accounting Cycle 2

Accounting Cycle 2

KG - University

32 Qs

Semester 2 Vocabulary

Semester 2 Vocabulary

9th - 12th Grade

29 Qs

Excel Final Exam

Excel Final Exam

9th - 12th Grade

34 Qs

Acctg Ch 7 Financial Statements

Acctg Ch 7 Financial Statements

9th - 12th Grade

30 Qs

Personal Characteristics of a Health Care Worker

Personal Characteristics of a Health Care Worker

9th - 12th Grade

30 Qs

CI-LO2 - Stages of Construction - True or False

CI-LO2 - Stages of Construction - True or False

Assessment

Quiz

Other

12th Grade

Medium

Created by

Callum Adams

Used 3+ times

FREE Resource

AI

Enhance your content

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

34 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Controls regarding time targets and costs should be set at the design phase.

True

False

Answer explanation

These targets are regularly reviewed once construction begins on a large project.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Steel fixers work with concreters and formworkers to construct structures using reinforced concrete.

True

False

Answer explanation

This type of construction is used a lot in infrastructure projects and on large office and residential buildings.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When a building is demolished the aggregates can be reused as hard core.

True

False

Answer explanation

Reusing and recycling is very important to reduce the amount of new materials extracted from the earth.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Non-fire doors are fitted during the preliminary/early stages on site.

True

False

Answer explanation

Installing internal doors and other second fix work is completed at the fit out stage.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Building Information Modelling (BIM) is only used at the design stage of a project.

True

False

Answer explanation

BIM is increasingly used by the industry throughout the construction phase and once a property is finished.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The final stage of a project, before occupation is fit out.

True

False

Answer explanation

During the fit out stage the internal space is made ready for the occupier to move in.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Laying carpets occurs during the construction phase of a project.

True

False

Answer explanation

Carpet laying occurs at the fit out phase. The construction phase is when the structure of the building is made.

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?