GMJ 6035 electrical quiz NEW 4

GMJ 6035 electrical quiz NEW 4

Professional Development

10 Qs

quiz-placeholder

Similar activities

Segmen Khas PPIM siri 2

Segmen Khas PPIM siri 2

9th Grade - Professional Development

15 Qs

Riddles

Riddles

KG - Professional Development

13 Qs

Discord quiz 2021

Discord quiz 2021

3rd Grade - Professional Development

10 Qs

OB 4-11-2023

OB 4-11-2023

Professional Development

14 Qs

Kuis Siapa Cepat

Kuis Siapa Cepat

Professional Development

10 Qs

Army- level 1

Army- level 1

KG - Professional Development

10 Qs

Pre Test Sasaran Keselamatan Pasien

Pre Test Sasaran Keselamatan Pasien

Professional Development

15 Qs

World Cup quiz

World Cup quiz

Professional Development

12 Qs

GMJ 6035 electrical quiz NEW 4

GMJ 6035 electrical quiz NEW 4

Assessment

Quiz

Other

Professional Development

Medium

Created by

Glen Johnson

Used 36+ times

FREE Resource

AI

Enhance your content

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following is the potential danger if temporary earth continuity is not applied when removing sections of copper pipework?

The consumer unit could be totally damaged beyond repair.

Death or serious injury to any persons through electric shock.

Excessive consumption of electricity whilst carrying out the plumbing work.

All the appliances connected to the ring main could blow their fuses.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

An electrical system using an mcb device that is to be safely isolated requires

the fuse to be removed

cross bonding to be fitted

the mcb covering with insulating tape

a locking device to be fitted.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A purpose of temporary continuity bonding is to

maintain an uninterrupted conductor to earth when removing pipework sections

provide a method of temporarily isolating the supply avoiding the need to turn off the main

bypass the mains supply from the consumer unit to a faulty appliance as a temporary repair

bridge the supply from the consumer unit to an appliance so polarity testing can be completed

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The most important safety precaution when working on a macerator WC is to ensure that the supply is

isolated at the appliance

isolated at the consumer unit

disconnected before the meter

disconnected before the consumer unit.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Before isolating a supply at the consumer unit in an occupied domestic dwelling situation the plumber should advise the

Local Authority

power supply company

NEICIE inspector

customer.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The minimum overload protection to an instantaneous shower has to be between 30 to 40 amps. The main reason for this is because of the unit’s

exposure to water

voltage rating

Amperage

kW rating

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

The item of equipment shown is used for testing

earth continuity

Polarity

safe isolation

insulation resistance.

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?