GMJ 6189 electrical quiz 1

GMJ 6189 electrical quiz 1

Professional Development

20 Qs

quiz-placeholder

Similar activities

Communications 6035-02

Communications 6035-02

Professional Development

24 Qs

Worldskills IC HSE

Worldskills IC HSE

Professional Development

15 Qs

L3 YR2 Revision 3 (Cold 3)

L3 YR2 Revision 3 (Cold 3)

Professional Development

20 Qs

Health and safety

Health and safety

Professional Development

15 Qs

Unit 201 Health and safety

Unit 201 Health and safety

Professional Development

20 Qs

level 3 mock test

level 3 mock test

Professional Development

19 Qs

HV 25 M1

HV 25 M1

Professional Development

23 Qs

Renewable Energy Quiz

Renewable Energy Quiz

Professional Development

25 Qs

GMJ 6189 electrical quiz 1

GMJ 6189 electrical quiz 1

Assessment

Quiz

Other

Professional Development

Medium

Created by

Glen Johnson

Used 16+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following documents covers the installation, testing and maintenance of a commercial electrical system?

Electricity at Work Regulations

Electrical Installation Guidelines

Building Regulations Part L

HASAW 1974.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which Building Regulations deals with the conservation of fuel and power?

Part P

Part G

Part L

Part J.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Name the type of cable that would be used in domestic installations?

Three core double-insulated flex

Flat profile thermoplastic

Individual cables

Heat-resistant flex.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When wiring a control system for an S plan installation (for example), where should all of the wires be centrally located?

The wiring centre

The fused spur

Individual junction boxes

Behind the programmer.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When removing components from copper pipework, earth continuity bonds must be used and the CSA of the cables must be sufficient to provide which of the following?

Rapid melting if a current travels through them

An equal resistance to the pipework being worked on

Full reconnection of the live circuit

The connection of safety lighting.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To reduce the risk of electric shock to the engineer, GS38 recommends the maximum length of exposed metal tips on equipment test probes should be:

16mm

10mm

6mm

4mm

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When installing and connecting an electric shower, which document should be referred to?

Building Regulations Part P

Manufacturer’s instructions

BS 7671

Electricity at Work Regulations.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?