Drainage part 6

Drainage part 6

12th Grade

34 Qs

quiz-placeholder

Similar activities

Java Control Structures

Java Control Structures

11th Grade - Professional Development

39 Qs

EMS (Engine Management Sistem) II

EMS (Engine Management Sistem) II

12th Grade

30 Qs

adobe photoshop 2015 certification quiz 1

adobe photoshop 2015 certification quiz 1

9th - 12th Grade

39 Qs

OCR Cambridge National ICT LO3

OCR Cambridge National ICT LO3

KG - Professional Development

34 Qs

CN10 _ Bài 8 _ Vẽ KT cơ sở

CN10 _ Bài 8 _ Vẽ KT cơ sở

9th - 12th Grade

33 Qs

Cấu trúc lặp - mảng

Cấu trúc lặp - mảng

8th - 12th Grade

30 Qs

IED Reverse Engineering

IED Reverse Engineering

12th Grade

32 Qs

Engine Test

Engine Test

12th Grade

30 Qs

Drainage part 6

Drainage part 6

Assessment

Quiz

Instructional Technology

12th Grade

Practice Problem

Hard

Created by

Nahom Sirane

Used 9+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

34 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the maximum distance from the invert level of the drain to the highest waste connection for an unventilated stub stack?

1 m

1.5 m

2 m

2.5 m

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the maximum vertical drop to the invert level of the drain from floor level for an unventilated stub stack?

1 m

1.3 m

1.5 m

2 m

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of an unventilated stub stack terminated with an access fitting?

To connect a group of ground floor appliances to the building drain

To ventilate the building drain

To increase water pressure in the building

To reduce noise from the plumbing system

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For what type of sanitary pipework systems is the air admittance valve suitable?

Systems up to five storeys high

Systems up to ten storeys high

Systems up to fifteen storeys high

Systems up to twenty storeys high

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In what position must the air admittance valve be fitted?

Horizontal position above the flood level

Vertical position above the flood level

Horizontal position below the flood level

Vertical position below the flood level

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where should the air admittance valve be installed within the building?

In a non-ventilated duct

In a ventilated duct, compartment, or roof space

In a non-ventilated compartment

In a non-ventilated roof space

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a critical condition to avoid when installing the air admittance valve?

Risk of overheating

Risk of freezing

Risk of overpressure

Risk of flooding

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?