4. Initial Verification of Electrical Installations

4. Initial Verification of Electrical Installations

Professional Development

40 Qs

quiz-placeholder

Similar activities

Electrical Engineering Quiz

Electrical Engineering Quiz

Professional Development

40 Qs

Central Heating 6035-02 | Part 4

Central Heating 6035-02 | Part 4

Professional Development

40 Qs

Understanding Computer Technical Solutions

Understanding Computer Technical Solutions

Professional Development

39 Qs

Ultimate Product Knowledge

Ultimate Product Knowledge

Professional Development

40 Qs

Communication Quiz

Communication Quiz

Professional Development

35 Qs

A+ Core 1 - 1101 - Quiz 2

A+ Core 1 - 1101 - Quiz 2

Professional Development

35 Qs

Central Heating 6035-02 | Part 5

Central Heating 6035-02 | Part 5

Professional Development

40 Qs

Final Exam

Final Exam

Professional Development

45 Qs

4. Initial Verification of Electrical Installations

4. Initial Verification of Electrical Installations

Assessment

Quiz

Professional Development

Professional Development

Hard

Created by

Sayed Habib

Used 2+ times

FREE Resource

40 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main purpose of an Initial Verification?

To complete the testing and issue an Electrical Installation Certificate.

To make a judgement that the installation is safe for continued use.

To confirm an installation is safe to be put into service.

To ensure all testing has been carried out.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What situation requires the issuing of a Minor Electrical Installation Works Certificate?

An additional lighting circuit has been installed.

Changing a consumer unit and protective devices.

Upgrading the cable and circuit breaker for a shower circuit.

Additional socket-outlets added to an existing ring final circuit.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which statutory document contains specific information relevant to Initial Verification?

The Electricity at Work Regulations.

Health and Safety guidance GS38.

The Health and Safety at Work Act.

BS 7671, Requirements for Electrical Installations.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the minimum voltage which requires the test leads and probes to comply with GS38?

25 V AC.

50 V AC.

120 V AC.

150 V AC.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many voltage measurements are required to confirm that a three-phase four-wire installation is safely isolated?

3

6

9

10

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What precaution is required before carrying out a test of external earth fault loop impedance (Zₑ) so as to avoid danger to users of an installation?

Lock off the supply.

Use insulated screwdrivers.

Warn the occupier of the premises.

Disconnect the main protective bonding conductors.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why does BS 7671 require inspection to be carried out before testing?

To confirm the installers have installed as per the job specification.

To confirm all the equipment is connected to the installation will work.

To confirm the installation is complete and it is safe to commence testing.

To confirm the Earthing Conductor is connected and it is safe to commence testing.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?

Discover more resources for Professional Development