BIM BOOM BOOM POW

BIM BOOM BOOM POW

5th Grade

5 Qs

quiz-placeholder

Similar activities

Sycamore DT quiz of the year

Sycamore DT quiz of the year

2nd - 5th Grade

9 Qs

3D Printing

3D Printing

5th Grade

10 Qs

3D PRINTER G5

3D PRINTER G5

5th Grade

5 Qs

G5 T3 Final project Revision

G5 T3 Final project Revision

5th Grade

10 Qs

AutoCAD

AutoCAD

KG - 7th Grade

10 Qs

BIM BOOM BOOM POW

BIM BOOM BOOM POW

Assessment

Quiz

Design

5th Grade

Easy

Created by

Ree-ree Ree-ree

Used 1+ times

FREE Resource

5 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does BIM stand for?

Business Information Modeling

Building Information Modeling

Building Information Management

Building Infrastructure Management

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which Autodesk product is specifically designed to support the BIM process?

Inventor

3ds Max

AutoCAD

Revit

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main advantage of BIM over traditional CAD?

BIM enables creation and management of information across the project lifecycle

BIM provides more detailed drawings

BIM is cheaper than CAD

BIM is easier to learn than CAD

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which sector benefits from BIM by exploring ideas using modeling tools for innovative design outcomes?

Structural Engineering

Architecture

Media & Entertainment

Civil Engineering

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the difference between 3D CAD modeling and BIM?

BIM is only used for entertainment content creation

3D CAD modeling captures metadata and behaviors, while BIM only focuses on geometry

BIM goes beyond geometry to capture relationships, metadata, and behaviors, while 3D CAD modeling does not

3D CAD modeling is more cost-effective than BIM