GEMBA Quick Changeover and SMED Quiz

GEMBA Quick Changeover and SMED Quiz

12th Grade

5 Qs

quiz-placeholder

Similar activities

Quiz on SMED System for Quick Changeovers

Quiz on SMED System for Quick Changeovers

12th Grade

5 Qs

9.4 Quiz on Reducing Set-Up Times

9.4 Quiz on Reducing Set-Up Times

12th Grade

11 Qs

ESS Test 1 (13th) 21-22

ESS Test 1 (13th) 21-22

1st - 12th Grade

7 Qs

Bts quiz

Bts quiz

KG - University

8 Qs

Elements of  Costing unit recap

Elements of Costing unit recap

1st - 12th Grade

7 Qs

How great leaders inspire action

How great leaders inspire action

KG - University

5 Qs

NC of Pt. with Heart Failure

NC of Pt. with Heart Failure

11th - 12th Grade

10 Qs

SMED Quiz

SMED Quiz

12th Grade

11 Qs

GEMBA Quick Changeover and SMED Quiz

GEMBA Quick Changeover and SMED Quiz

Assessment

Interactive Video

Specialty

12th Grade

Hard

Created by

Nurhana Juraimi

FREE Resource

5 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary focus of Quick Changeover and SMED?

Reducing customer satisfaction

Increasing machine downtime

Basic workplace organization and planning

Spending money on special tooling

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does SMED stand for?

Standardized Manufacturing Execution Documentation

Speedy Machine Equipment Development

Systematic Manufacturing Efficiency Design

Single Minute Exchange of Dies

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How does Quick Changeover lead to the reduction of lead time?

By increasing lot sizes

By creating value faster when machines are running

By reducing machine velocity

By increasing machine downtime

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is one benefit of Quick Changeover related to on-time delivery improvement?

Reduced waiting time for customers

Improved flexibility

Reduced lot sizes

Increased lead time

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How does Quick Changeover lead to a reduction in inventory?

By increasing inventory carrying costs

By decreasing cash flow

By reducing lead time

By increasing lot sizes