SE 102 - FINAL EXAMINATION
Authored by Jing Gongora
Computers
University
Used 1+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
50 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
During the initial requirements gathering phase, the team realized that key stakeholders were unavailable for meetings. How should the team handle this situation?
a) Proceed without their input and make assumptions.
b) Reschedule meetings and use surveys to gather input.
c) Ignore their input since it’s not critical.
d) Delay the project indefinitely until they are available.
2.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
While developing the system, the team encountered an unexpected bug that caused frequent crashes. What is the best approach to resolve this?
a) Ignore the bug and continue development.
b) Implement a quick fix without analyzing the root cause.
c) Pause development and perform a thorough debugging session.
d) Revert to an earlier version of the system and start over.
3.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
Midway through the project, a major requirement change was requested by the client. How should the team respond?
a) Reject the change to stay on schedule.
b) Incorporate the change without assessing its impact.
c) Assess the impact on timeline and resources before deciding.
d) Make the change immediately and inform the client of delays later.
4.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
The system's performance was suboptimal during testing. Which of the following is the best first step to address this issue?
a) Increase the hardware resources.
b) Optimize the code and database queries.
c) Ignore the performance issues.
d) Blame the users for not using the system correctly.
5.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
During integration, the team found that different modules were not compatible. What should they do?
a) Rewrite all modules from scratch.
b) Use middleware to facilitate integration.
c) Cancel the project due to incompatibility.
d) Assign blame to the team members responsible for the modules.
6.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
The system was deployed, but users are reporting frequent usability issues. What is the best course of action?
a) Tell users to adapt to the system as it is.
b) Collect feedback and make iterative improvements.
c) Ignore the feedback and focus on new features.
d) Roll back to the previous system and abandon the new one.
7.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
A critical data migration step failed during deployment. How should the team address this?
a) Ignore the failure and proceed with deployment.
b) Perform a rollback and fix the migration script.
c) Manually migrate the data without fixing the script.
d) Blame the database administrators for the failure.
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?