1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

During the initial requirements gathering phase, the team realized that key stakeholders were unavailable for meetings. How should the team handle this situation?

  • a) Proceed without their input and make assumptions.

  • b) Reschedule meetings and use surveys to gather input.

  • c) Ignore their input since it’s not critical.

d) Delay the project indefinitely until they are available.

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

While developing the system, the team encountered an unexpected bug that caused frequent crashes. What is the best approach to resolve this?

  • a) Ignore the bug and continue development.

  • b) Implement a quick fix without analyzing the root cause.

  • c) Pause development and perform a thorough debugging session.

d) Revert to an earlier version of the system and start over.

3.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Midway through the project, a major requirement change was requested by the client. How should the team respond?

  • a) Reject the change to stay on schedule.

  • b) Incorporate the change without assessing its impact.

  • c) Assess the impact on timeline and resources before deciding.

d) Make the change immediately and inform the client of delays later.

4.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

The system's performance was suboptimal during testing. Which of the following is the best first step to address this issue?

  • a) Increase the hardware resources.

  • b) Optimize the code and database queries.

  • c) Ignore the performance issues.

d) Blame the users for not using the system correctly.

5.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

During integration, the team found that different modules were not compatible. What should they do?

  • a) Rewrite all modules from scratch.

  • b) Use middleware to facilitate integration.

  • c) Cancel the project due to incompatibility.

d) Assign blame to the team members responsible for the modules.

6.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

The system was deployed, but users are reporting frequent usability issues. What is the best course of action?

  • a) Tell users to adapt to the system as it is.

  • b) Collect feedback and make iterative improvements.

  • c) Ignore the feedback and focus on new features.

d) Roll back to the previous system and abandon the new one.

7.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

A critical data migration step failed during deployment. How should the team address this?

  • a) Ignore the failure and proceed with deployment.

  • b) Perform a rollback and fix the migration script.

  • c) Manually migrate the data without fixing the script.

d) Blame the database administrators for the failure.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?