Oversee & Design Mock Paper 1

Oversee & Design Mock Paper 1

Professional Development

44 Qs

quiz-placeholder

Similar activities

AZ-900 Practice Test 1

AZ-900 Practice Test 1

Professional Development

43 Qs

SOAL LATIHAN TES PEDAGOGIK UMUM ( PPPK )

SOAL LATIHAN TES PEDAGOGIK UMUM ( PPPK )

Professional Development

45 Qs

TUTORIAL 1

TUTORIAL 1

University - Professional Development

40 Qs

Wagon R

Wagon R

Professional Development

46 Qs

DAR South Cotabato Examination for New Entrants

DAR South Cotabato Examination for New Entrants

Professional Development

40 Qs

Spirochaetaceae. Fungii patogeni

Spirochaetaceae. Fungii patogeni

Professional Development

40 Qs

Tik Tok con Hugo

Tik Tok con Hugo

Professional Development

40 Qs

PG SERVICE SEPEDA MOTOR INJEKSI

PG SERVICE SEPEDA MOTOR INJEKSI

Professional Development

40 Qs

Oversee & Design Mock Paper 1

Oversee & Design Mock Paper 1

Assessment

Quiz

Other

Professional Development

Medium

Created by

Amir Karbassi

Used 6+ times

FREE Resource

44 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When explaining installation details to colleagues it is important to make sure that

Colleagues are tested about their understanding

Technical terms are used constantly

Instructions are clear and thorough

Colleagues are given a copy of the installation specification

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

An ECS (Electrotechnical certification scheme) card is valid for how many years?

10

1

5

3

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Due to bad weather conditions, your company has not been able to complete the outside work by the agreed date. This could lead to

The outside work being completed after the client has moved in

The job completion being delayed

Your company requesting a variation order so that the work can be completed

Cancellation of all outside works

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A variation order to install additional outlets will be issued by the

Client

Sub - contractor

Site manager

Contractor

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which document details the number and types of components that are needed for a project?

Gantt chart

Material schedule

Quotation

Site report

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A project is scheduled to take 160 person hours for completion. If the working day is 8 hours, what is the minimum number of staff required to complete the project within 10 days?

4

2

3

1

7.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

Media Image

Identify the two correct pieces of equipment for carrying out the tests shown in the table.

Tong tester

Earth fault loop impedance tester

Continuity tester

Insulation resistance tester

Voltage inductor

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?