Module 22201 Exam Introduction to Earthmoving

Module 22201 Exam Introduction to Earthmoving

9th - 12th Grade

25 Qs

quiz-placeholder

Similar activities

DDA I Unit 4

DDA I Unit 4

9th - 12th Grade

20 Qs

CORE Module 1 Build Your Future Trade Terms (20)

CORE Module 1 Build Your Future Trade Terms (20)

9th - 12th Grade

20 Qs

Beechcraft Starship Quiz

Beechcraft Starship Quiz

12th Grade - University

20 Qs

S2 CPA EOY Revision 1 (WSSS 2018)

S2 CPA EOY Revision 1 (WSSS 2018)

10th Grade

20 Qs

Chapter 4 PPT Vocabulary

Chapter 4 PPT Vocabulary

7th - 12th Grade

24 Qs

G8 Quiz 1

G8 Quiz 1

10th Grade

20 Qs

Site Work Operation

Site Work Operation

11th Grade

20 Qs

TEKNOLOGI INFORMASI DAN KOMUNIKASI (TIK) KELAS 9

TEKNOLOGI INFORMASI DAN KOMUNIKASI (TIK) KELAS 9

9th Grade

20 Qs

Module 22201 Exam Introduction to Earthmoving

Module 22201 Exam Introduction to Earthmoving

Assessment

Quiz

Instructional Technology

9th - 12th Grade

Medium

Created by

Brody Griffies

Used 15+ times

FREE Resource

25 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Excavated material is returned to an excavation site as _____.

fore-fill

sub-fill

back-fill

finish-fill

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To enhance the strength of the soil and give it cement-like properties, fly ash is mixed with

lime

water

portland cement

chemical binders

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The main purpose of compaction is to _____.

trap water within the soil

compress air pockets in the fill

decrease the soil density

reduce the risk of future settling

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The preferred atmospheric condition for performing soil stabilization is _____.

hot and dry

mild with little or no rain

cool or cold with gentle, continuous rain

any that permits compaction operations

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Soil stabilization is the process of preparing sub-base soils to provide a _____.

softer soil base

consistent color and texture

higher loadbearing capacity

pozzolan mixture in the soil base

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

During the excavation cycle, after dumping a load, the equipment is _____.

trimming

hauling

loading

backhauling

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A traffic control supervisor on a construction project is responsible for _____.

managing operating conditions at the loading and dumping sites

directing traffic flow at the entrance of the job site

designing the traffic signs to be used on the project

evaluating the qualifications of equipment drivers

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?