QUIZ: IBS Score

QUIZ: IBS Score

University

10 Qs

quiz-placeholder

Similar activities

III_B_SE_Quiz_3

III_B_SE_Quiz_3

University

10 Qs

Topic 2 Satellite System Elements

Topic 2 Satellite System Elements

University

10 Qs

BUILDING QUALITY / QLASSIC

BUILDING QUALITY / QLASSIC

University

11 Qs

Brain Break- NGSS

Brain Break- NGSS

KG - University

12 Qs

AK B5 PEMBINAAAN (SET 3@ IBS)

AK B5 PEMBINAAAN (SET 3@ IBS)

University

15 Qs

Software Engineering (UML)

Software Engineering (UML)

University

15 Qs

Technical Specifications

Technical Specifications

University

10 Qs

Kuiz Teras Nadi Keunggulan KPM

Kuiz Teras Nadi Keunggulan KPM

University

10 Qs

QUIZ: IBS Score

QUIZ: IBS Score

Assessment

Quiz

Other

University

Easy

Created by

SUSHILAWATI BINTI ISMAIL SUSHILAWATI BINTI ISMAIL

Used 1+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Choose the type of projects that are not applicable to be scored by referring to CIS18:2018

Housing

Shopping mall

Bridges

Museums

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following is the attribute of the IBS Scoring System?

Volume of the building

Repetition of components

Type of construction material

Project cost

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

IBS Score distributed to the following:


50% Structural system + 30% Wall system + 20% Slab system


50% Structural system + 30% Wall system + 20% Other simplified solutions


50% Structural system + 20% Wall system + 30% Other simplified solutions


50% Structural system + 20% Wall system + 30% Slab system

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

For IBS Score calculation for multi-storey building, it should start with the top level, following to the lower level until the ground.

True

False

5.

FILL IN THE BLANK QUESTION

2 mins • 1 pt

By referring TABLE 2 in CIS18:2018, determine the IBS Factor, Fs for the following structural components for the ground floor of a building.

Precast concrete beam

Column with timber formwork

All slab pre-stress plank

6.

FILL IN THE BLANK QUESTION

2 mins • 1 pt

By referring TABLE 2 in CIS18:2018, determine the IBS Factor, Fs for the following structural components for the first floor of a building.

Load bearing wall using system formwork

7.

FILL IN THE BLANK QUESTION

1 min • 1 pt

By referring TABLE 3 in CIS18:2018, determine the IBS Factor, Fs for the following structural components for the roof of a building.

Prefab roof truss

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?