Textile Engineering Quiz

Textile Engineering Quiz

12th Grade

15 Qs

quiz-placeholder

Similar activities

ENGINE COOLING SYSTEM ASSESSMENT

ENGINE COOLING SYSTEM ASSESSMENT

9th Grade - University

20 Qs

Brakes, Steering, and Suspension Knowledge

Brakes, Steering, and Suspension Knowledge

9th - 12th Grade

15 Qs

Cthulhu Mythos finale exam

Cthulhu Mythos finale exam

4th Grade - University

10 Qs

Nord - Tabish

Nord - Tabish

1st Grade - Professional Development

10 Qs

Rules Quiz: Cosmic Encounter

Rules Quiz: Cosmic Encounter

9th - 12th Grade

10 Qs

IB ESS Topic 6.2 Stratospheric ozone

IB ESS Topic 6.2 Stratospheric ozone

11th - 12th Grade

20 Qs

Screen Printing

Screen Printing

10th - 12th Grade

20 Qs

Electrical 1

Electrical 1

KG - University

15 Qs

Textile Engineering Quiz

Textile Engineering Quiz

Assessment

Quiz

Other

12th Grade

Easy

Created by

Sagar Jawale

Used 7+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Once the norms set, it remains static.

True

False

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

which term is used to express the strength of the splice in relation to the parent yarn strength in winding.

Splice Breaking Ratio

Splice Appearance Grade

Retained Splice Strength

None of the given options

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

MIS system means --------.

Management Information System

Management Intelligence System

Manual Information System

None of the given options

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Knot factor is one of the parameters used for assessing the -------- performance.

Splicer

Clearer

Autotense Device

None of the given options

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Among the following options, the thickest classimat fault is --.

B3

D1

G

H2

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

which technique is used for controlling the machine downtime.

Snap study technique

Fish bone

SMED technique

None of the given options

7.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

Emphasis in the weaving preparatory process should be on the --------.

Productivity

Quality of preparation

Productivity as well as quality

Cost of production

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?