27105 #5 Apply Floor Systems

27105 #5 Apply Floor Systems

9th Grade

30 Qs

quiz-placeholder

Similar activities

Quiz Review Intro to Construction Documents - Part 1

Quiz Review Intro to Construction Documents - Part 1

9th - 10th Grade

25 Qs

Chapter 17 Hairstyling

Chapter 17 Hairstyling

9th - 12th Grade

28 Qs

Floor and Wall Framing

Floor and Wall Framing

9th - 12th Grade

31 Qs

Fasteners 1 - Vogt Ch 9 (Nails, Screws, Bolts)

Fasteners 1 - Vogt Ch 9 (Nails, Screws, Bolts)

9th - 12th Grade

32 Qs

27105 Floor Systems # 2

27105 Floor Systems # 2

9th Grade

34 Qs

The Integumentary System

The Integumentary System

8th - 10th Grade

25 Qs

Christmas Trivia

Christmas Trivia

9th Grade

25 Qs

Interior Design Final

Interior Design Final

9th - 12th Grade

35 Qs

27105 #5 Apply Floor Systems

27105 #5 Apply Floor Systems

Assessment

Quiz

Specialty

9th Grade

Hard

Created by

Christopher Foy

FREE Resource

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of checking a foundation in construction?

To ensure it can support a heavy load

To verify its squareness

To measure its depth

To check for water resistance

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a method used in the construction of floor systems?

Installing roof shingles

Laying out and fastening sill plates to the foundation

Painting the interior walls

Wiring electrical outlets

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is crucial to describe when installing a beam or girder in floor systems?

The color and finish of the beam

The weight of the beam

The proper procedure for installation

The manufacturer of the beam

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in assembling a floor system according to the document?

Framing the first floor

Coordinating with other trades

Completing the foundation and setting up the concrete or mortar

Backfilling the foundation

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is the foundation backfilled before framing the first floor?

To coordinate with other trades

To begin the assembly of the floor system

To help the foundation withstand lateral pressure from the soil

To ensure proper ductwork, piping, and wiring

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When building a floor system, what must be coordinated with other trades?

The completion of the foundation

The backfilling of the foundation

The framing of the first floor

The framing to accommodate ductwork, piping, wiring, etc.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in constructing a platform floor assembly according to the sequence provided?

Install the joists.

Build and/or install the girders and supports.

Check the foundation for squareness.

Install the subfloor.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?