AMT 11-05 Aircraft Electrical Power Final Period Long Quiz Set 1

AMT 11-05 Aircraft Electrical Power Final Period Long Quiz Set 1

University

30 Qs

quiz-placeholder

Similar activities

Instalasi Listrik Residensial (ALX)

Instalasi Listrik Residensial (ALX)

University

25 Qs

Catu Daya

Catu Daya

University

25 Qs

INTMECH LECTURE 6

INTMECH LECTURE 6

University

25 Qs

Basic Electronics Quiz

Basic Electronics Quiz

University - Professional Development

25 Qs

STS-S&T in Philippines

STS-S&T in Philippines

University

25 Qs

AMT 11-05 Aircraft Electrical Power Final Period Long Quiz Set 1

AMT 11-05 Aircraft Electrical Power Final Period Long Quiz Set 1

Assessment

Quiz

Science

University

Hard

Created by

JOHN PUNGTILAN

FREE Resource

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In a large multi-engine aircraft, what serves as backup power in case of alternator failure?

APU Generator

Ram Air Turbine

  1. Battery circuit

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

 In a split-bus power distribution system, how are AC bus 1 and AC bus 2 powered during normal operation?

  1. Both buses are powered by generator 1

  1. Each bus is powered by a different generator

  1. Each bus is powered by a different generator

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How do DC buses receive power in a parallel power distribution system?

  1. Directly from the battery

  1. Via transformer units

  1. From AC busses through converters

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What role do Generator Control Units (GCU) play in the electrical system?

Manage individual generators

  1. Control distribution of DC power

  1. Monitor battery voltage

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

 What type of power does the Boeing 747-400's TR units provide as backups?

  1. Alternating current (AC)

  1. Direct current (DC)

  1. Emergency power

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which component ensures correct generator operation in the AC power system?

  1. Bus Power Control Unit (BPCU)

  1. Generator Control Unit (GCU)

  1. Control transformers

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the function of the ram air turbine in the split-bus power distribution system?

  1. Provides emergency AC power

  1.  Supplies power to the APU

  1. Acts as an additional generator in case of failure

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?