UA Local 467 Chapter 25 Quizizz

UA Local 467 Chapter 25 Quizizz

12th Grade

31 Qs

quiz-placeholder

Similar activities

ONE 6th FORM Unit 11 EoT Quiz Cyber Security

ONE 6th FORM Unit 11 EoT Quiz Cyber Security

12th Grade

30 Qs

Drainage part 8

Drainage part 8

12th Grade

29 Qs

Ulangan Harian TKR 12 TKR D

Ulangan Harian TKR 12 TKR D

12th Grade

35 Qs

Ultimate Quiziz Part

Ultimate Quiziz Part

9th - 12th Grade

28 Qs

Hot  water Regulation Systems part 1

Hot water Regulation Systems part 1

12th Grade

34 Qs

Introduction to Quality

Introduction to Quality

9th - 12th Grade

26 Qs

Test Java Base

Test Java Base

9th - 12th Grade

28 Qs

UA Local 467 Chapter 25 Quizizz

UA Local 467 Chapter 25 Quizizz

Assessment

Quiz

Instructional Technology

12th Grade

Medium

Created by

Louis Nunes

Used 22+ times

FREE Resource

31 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The ____ for a rooftop packaged unit retrofit application includes a zone temperature sensor package with override, a power supply package, the rooftop unit wiring diagram, and a riser diagram for controller addressing.

pneumatic controller

building survey

database

materials list

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Many hot water boiler systems have a ____ which controls the temperature of the water pumped through the building heating coils.

pressure valve

three-way valve

120 V control circuit

digital interface

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Most new chillers have a built-in ____.

cooling tower

water circulation system

microprocessor control panel

power supply system

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A common alternate retrofit strategy for a chiller control system is to ____.

use variable frequency drives in place of vane volume control

reset the fan static setpoint based on zone demand

install a flame safeguard controller that is compatible with the BAS communication bus

install a translator panel to allow the BAS to view and command points inside the microprocessor control panel

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A boiler control retrofit application normally consists of retrofitting an existing ____ boiler control system to a building automation system.

electromechanical

ON/OFF

digital

three-phase

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A(n) ___ is the process of upgrading building controls and mechanical systems with a building automation system.

modification

rebuild

retrofit

upgrade

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A(n) ___ is an inventory of the energy-consuming equipment in a commercial building.

building survey

materials list

energy survey

equipment list

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?