log301

log301

University

21 Qs

quiz-placeholder

Similar activities

Comply with TP Part 2

Comply with TP Part 2

University

17 Qs

Greek Civilization

Greek Civilization

University

20 Qs

CONSTRUCTION MANAGEMENT DLS-CSB

CONSTRUCTION MANAGEMENT DLS-CSB

University

25 Qs

IELTS 7A - Arts and Architecture

IELTS 7A - Arts and Architecture

8th Grade - Professional Development

20 Qs

PP3 ODAR3 CSB FINAL EXAM

PP3 ODAR3 CSB FINAL EXAM

University

20 Qs

JPT TAPP PRE-BOARD Part 5

JPT TAPP PRE-BOARD Part 5

University

25 Qs

Professional Practice 2 UE Final Examination

Professional Practice 2 UE Final Examination

University

20 Qs

201 - Scope of Pre Design Services

201 - Scope of Pre Design Services

University

17 Qs

log301

log301

Assessment

Quiz

Architecture

University

Medium

Created by

Phan Việt

Used 2+ times

FREE Resource

21 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Question 1: Which forecasting method uses average demand over several previous periods?

Moving average

Trend Analysis

Linear Smoothening

None of the above

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Question 2: What assumptions are made about forecasting methods?

Demand variation must be linear

The past is an acceptable indicator of the future

Demand variation must be small

The past is not an acceptable indicator of the future

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Question 3: Final item A is made from sub-component B & C. Sub-component B is made from part D and raw material E. Which component needs to be forecasted?

A, B, C, D and E

B and C

c and E

Only A

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Question 4: Which of the following is typical of a need?

It contains average variation

It contains seasonal fluctuations

It does not contain random flucutations

All of the above

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following does not belong?

Trend

Cyclical

Average

Random Fluctuations

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following manufacturing strategies has the longest delivery lead-time?

ATO

MTS

ETO

MTO

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is manufacturing important to the economy?

It decreases employment and prevents waste

It creates wealth and reduces waste.

It adds value to products and creates wealth.

None of the above.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?