PROF PRACc-204a

PROF PRACc-204a

University

29 Qs

quiz-placeholder

Similar activities

QUIZ - QS

QUIZ - QS

University

25 Qs

PROFESSIONAL PRACTICE 1 - FINAL EXAM

PROFESSIONAL PRACTICE 1 - FINAL EXAM

University

30 Qs

Midterm na

Midterm na

University

30 Qs

HISTORY, THEORY AND PROFESSIONAL PRACTICE

HISTORY, THEORY AND PROFESSIONAL PRACTICE

University

30 Qs

GROUP3 QUIZIZ (NEW)

GROUP3 QUIZIZ (NEW)

KG - Professional Development

25 Qs

AR 429B - QUIZ MT 01

AR 429B - QUIZ MT 01

University

25 Qs

JPT HOA PREBOARD (Ar. Almo Part 1)

JPT HOA PREBOARD (Ar. Almo Part 1)

University

25 Qs

PROFESSIONAL PRACTICE 2 UE MIDTERM EXAM

PROFESSIONAL PRACTICE 2 UE MIDTERM EXAM

University

30 Qs

PROF PRACc-204a

PROF PRACc-204a

Assessment

Quiz

Architecture

University

Easy

Created by

Bubbbly Dc

Used 1+ times

FREE Resource

29 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

who orders for the implementation of a project;

The individual or group of individuals

The Owner

The Contractor

The Architect

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

and his Specialist Consultants (SCs) who render plan / design services and

limited inspection work;

The individual or group of individuals

The Owner

The Contractor

The Architect

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

who performs the construction work;

The individual or group of individuals

The Owner

The Contractor

The Architect

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

who assist in the supervision and delivery of the

work.

The individual or group of individuals

The Owner

The Contractor

The Architect

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

is directly and professionally responsible and

liable for the construction supervision of the project.

The Architect-in-charge of construction (Aicc)

Construction Supervision Group (CSG)

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

is normally recommended by the Architect based on

their performance, and hired by the Owner.

The Architect-in-charge of construction (Aicc)

Construction Supervision Group (CSG)

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

SCOPE OF SERVICES

2.1 Quality Control

2.2 Evaluation of Construction Work

2.3 Preparation of Daily Inspection Reports

2.4 Filing of documents

There are two ways by which the Architect may enter into contract with the Owner:

3.1 Working in a dual capacity as Architect-of-record and as Consulting Architect for fulltime

supervision services or as the Construction Supervision Group (CSG). As the Architect-of-

record (Aor) of the project, the Aor is in a better position to interpret his drawings and

documents and to assure conformity by the Contractor. He can assign his staff to undertake the

fulltime supervisory work to perform the works as enumerated in the Architect’s Guidelines.

3.2 Working as Consulting Architect for fulltime supervision services only or as the CSG.

The Architect’s compensation is based on the Architect’s / architectural firm’s talents, skill,

experience, and on the type and level of professional services provided.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?