a320 cbt 2

a320 cbt 2

Professional Development

20 Qs

quiz-placeholder

Similar activities

LATIHAN SOAL TEMA 6 KELAS 4

LATIHAN SOAL TEMA 6 KELAS 4

Professional Development

20 Qs

science quiz

science quiz

5th Grade - Professional Development

20 Qs

CLAIMS AWR

CLAIMS AWR

Professional Development

20 Qs

6008 Applications_Knowledge Assessment

6008 Applications_Knowledge Assessment

Professional Development

22 Qs

ilmu reseo kelas x

ilmu reseo kelas x

Professional Development

20 Qs

Quiz: Practicing occupational health and safety procedures

Quiz: Practicing occupational health and safety procedures

KG - Professional Development

15 Qs

fitter TT test

fitter TT test

Professional Development

25 Qs

Kuiz Piramid Makanan

Kuiz Piramid Makanan

KG - Professional Development

15 Qs

a320 cbt 2

a320 cbt 2

Assessment

Quiz

Special Education

Professional Development

Hard

Created by

nusantara aviasi

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

01: Conditioned air is distributed to:
A: Cockpit, cargo bays and cabin
B: Cockpit, fwd and aft cabins
C: Cockpit, avionics bay and cabin
D: Cockpit, cabin and holds 1 and 2 only

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

02: Hot air fault light illuminates on the air conditioning panel
A:  The hot air press. reg. valve opens and the trim air valves close.
B:  The hot air press. reg. valve closes and the trim air valves open.
C: The hot air press. reg. valve closes and the trim air valves close.
D: The hot air press. reg. valve opens and the trim air valves open.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

3:Does the trim air provide the warm air or the cold air to the air conditioning system?
A: Cold air
B: Warm air
C : normal air
D : none

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

4: In case of zone controller primary and secondary channel failure, what temperatures are maintained by pack one and pack two?
A: 15 deg.C both
B: 25 deg.C both
C: 20 deg.C for pack one and 10 deg.C for pack two
D: 24 deg.C for pack one and 15 deg.C for pack two

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

5: In normal flight in closed circuit configuration, the avionics ventilation system controls the temperature of the cooling air by:
A:'Adding air conditioned air to the flow
B: Extracting air overboard
C: Adding avionics bay air
D: Passing air through a skin heat exchanger

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

6: To enable Ram air to the mixture unit, The Ram air switch should be used:
A: At any time
B: Only when differential pressure is less than 1 psi.
C: When pressure is greater than 1 psi diff.
D: Only after outflow valve is fully opened

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

7: Pack controller, primary channel failure.
A: The secondary computer operates as a backup mode and regulation is not optimized
B: The secondary computer takes over (all functions as normal)
C: Pack is lost
D: Pack outlet temperature is controlled at 15 deg.C

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?