BSE Unit 5 Waste Management big Quiz

Quiz
•
Professional Development
•
12th Grade
•
Hard

Miles Tarplee
Used 3+ times
FREE Resource
63 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What does the 'Prevention' stage in waste management include?
Landfill and incineration without energy recovery
Using less material in design and manufacture
Checking, cleaning, repairing, refurbishing, whole items or spare parts
Turning waste into a new substance or product
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is involved in the 'Preparing for re-use' stage of waste management?
Using less material in design and manufacture
Checking, cleaning, repairing, refurbishing, whole items or spare parts
Includes anaerobic digestion, incineration with energy recovery
Landfill and incineration without energy recovery
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is a part of the 'Recycling' stage of waste management?
Using less material in design and manufacture
Checking, cleaning, repairing, refurbishing, whole items or spare parts
Turning waste into a new substance or product
Landfill and incineration without energy recovery
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What does 'Other recovery' include in the context of waste management?
Using less material in design and manufacture
Checking, cleaning, repairing, refurbishing, whole items or spare parts
Includes anaerobic digestion, incineration with energy recovery, gasification and pyrolysis which produce energy (fuels, heat and power) and materials from waste; some backfilling
Landfill and incineration without energy recovery
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is considered 'Disposal' in waste management?
Turning waste into a new substance or product
Includes anaerobic digestion, incineration with energy recovery, gasification and pyrolysis which produce energy (fuels, heat and power) and materials from waste; some backfilling
Landfill and incineration without energy recovery
Using less material in design and manufacture
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the purpose of a Site Waste Management Plan (SWMP) in construction?
To monitor and control the budget of a construction project
To monitor and control the waste produced on a construction project
To monitor and control the construction project timeline
To monitor and control the number of workers on a construction project
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Who should work in conjunction with the principal contractor to produce a SWMP?
The local government
The construction workers
The client
The building services engineer
Create a free account and access millions of resources
Similar Resources on Wayground
66 questions
MSSC Quality Review 1

Quiz
•
11th Grade - Professi...
66 questions
Unit-8 Maintaining Lighting System

Quiz
•
12th Grade
60 questions
Pre u p s c test 22 aug

Quiz
•
12th Grade
65 questions
BSE UNIT 12 LESSON 12 Modern Electrotechnical Installations Quiz

Quiz
•
12th Grade
60 questions
Test1 Cam 17 Class 5.5 Quiz part2

Quiz
•
12th Grade
61 questions
Quiz sobre Resistores

Quiz
•
12th Grade
Popular Resources on Wayground
10 questions
Video Games

Quiz
•
6th - 12th Grade
20 questions
Brand Labels

Quiz
•
5th - 12th Grade
15 questions
Core 4 of Customer Service - Student Edition

Quiz
•
6th - 8th Grade
15 questions
What is Bullying?- Bullying Lesson Series 6-12

Lesson
•
11th Grade
25 questions
Multiplication Facts

Quiz
•
5th Grade
15 questions
Subtracting Integers

Quiz
•
7th Grade
22 questions
Adding Integers

Quiz
•
6th Grade
10 questions
Exploring Digital Citizenship Essentials

Interactive video
•
6th - 10th Grade