1.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

What data does the system require to determine the safety stock during automatic reorder point planning? Note: There are 3 correct answers to this question.

Service level

Replenishment lead time

Minimum and maximum stock levels

Mean absolute deviation

The storage costs code

2.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

You want to create a purchase order. An info record is available for the material-supplier combination. What logic does the system use to determine a price from the info record? Note: There are 2 correct answers to this question.

The system always proposes the price from the last purchase order, if available.

If there are NO valid conditions, the system can propose the price from the last purchase order, if available.

The system always proposes the valid plant-specific price, if available.

The system always proposes the price stored at purchasing organization level, if available.

3.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

Which of the following are features of a subcontracting procurement process? Note: There are 3 correct answers to this question.

You can customize the control parameters for the subcontracting item category.

You can assign a subcontracting order item to an account.

You can maintain components to be provided in a bill of material.

You can have subcontracting purchase requisitions created by MRP.

You can post a non-valuated goods receipt for a subcontracting order item.

4.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

Which of the following tasks does the system perform during reorder point planning? Note: There are 2 correct answers to this question.

Flag materials that have been subject to an activity relevant to MRP.

Perform backward scheduling to determine the availability dates of purchase requisitions.

Carry out a lot-size calculation for every material with net requirements.

Carry out a net requirement calculation for every material included in the planning run.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which field can you use to prevent a discontinued material from being procured?

Control Code

Material Status

Authorization Group

Special Procurement Type

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which field controls the creation of a scheduling agreement with release documentation?

Item Category

Agreement Type

JIT Indicator

Creation Profile

7.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

Which situations lead to an open item on the GR/IR clearing account? Note: There are 2 correct answers to this question.

The ordered quantity for a purchase order item is more than the invoiced quantity.

The invoiced quantity for a purchase order item is more than the delivered quantity.

The ordered quantity for a purchase order item is more than the delivered quantity.

The delivered quantity for a purchase order item is more than the invoiced quantity.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?