
science revision 23/24
Authored by jon May
Science
Professional Development
Used 2+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
56 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Why should a temporary earth bond be fitted before cutting into any metallic pipework?
To prevent water leakage
To maintain the earth continuity
To measure the pipe's diameter
To check the water pressure
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
How long should the clamps of a temporary earth bond be left in place?
Until the pipework is replaced
Until the pipework is tested for leaks
Until the permanent electrical continuity is re-established
Until the temporary earth bond is no longer needed
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What must all circuits and appliances be protected by according to modern regulations?
An RCD only
A fuse or MCB
A fuse or MCB and an RCD
Isolation switch
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Where is permanent de-commissioning done?
At the appliance
At the consumer unit
At the main switch
At the circuit breaker
5.
OPEN ENDED QUESTION
3 mins • 1 pt
What is required for every circuit and appliance for safety?
Evaluate responses using AI:
OFF
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Where can temporary de-commissioning be done?
At the consumer unit
At the main switch
At the appliance
At the circuit breaker
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What does the symbol with a straight line on top of a dashed line represent in electrical diagrams?
AC symbol
Ground connection
DC symbol for rectified current
DC symbol for battery
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?