Construction materials and methods.

Construction materials and methods.

12th Grade

41 Qs

quiz-placeholder

Similar activities

Try Out US Bisnis Konstruksi Properti

Try Out US Bisnis Konstruksi Properti

12th Grade

40 Qs

kisi PJOK

kisi PJOK

6th Grade - University

38 Qs

gggb

gggb

12th Grade

37 Qs

2nd quarter review game

2nd quarter review game

10th Grade - University

45 Qs

PTS 2 MATEMATIKA KELAS 5 SDN GUNUNGPUYUH CBM

PTS 2 MATEMATIKA KELAS 5 SDN GUNUNGPUYUH CBM

4th Grade - University

40 Qs

Measurement Quiz

Measurement Quiz

12th Grade

39 Qs

Try Out US DESAIN PEMODELAN INFORMASI BANGUNAN

Try Out US DESAIN PEMODELAN INFORMASI BANGUNAN

12th Grade

40 Qs

Sistema Diédrico

Sistema Diédrico

12th Grade

37 Qs

Construction materials and methods.

Construction materials and methods.

Assessment

Quiz

Architecture

12th Grade

Medium

Created by

Conrad Wheeler

Used 21+ times

FREE Resource

41 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

1 What type of foundation is this?

A          Raft

B          Wide Strip

C          Pile

D          Narrow Strip

Answer explanation

The correct type of foundation is a Narrow Strip, as indicated in the answer choices. This type of foundation is commonly used in construction projects.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

 

2 What processes are these images showing?

A              Pad

B              Narrow Strip

C     Stepped Foundation

D              Pile

Answer explanation

The correct choice is D. The images are showing the process of Pile foundation construction.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

3 In the construction of a new residential building, which one of the following is not typically considered a necessary utility service?

D           Wi-Fi

C           Drainage

B           Electric

A           Water

Answer explanation

In the construction of a new residential building, Wi-Fi is not typically considered a necessary utility service, unlike water, electric, and drainage.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

During the construction of a residential house, what is the term used for the gap left between the brickwork and blockwork for insulation purposes?

A        Middle

B        Space

C       Cavity

D       Gap

Answer explanation

The term used for the gap left between the brickwork and blockwork for insulation purposes is 'Cavity'.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

During the construction of a new residential building, the architect specifies a particular type of floor construction. Which type is it?

 

A  Solid concrete floor.

B  Suspended floor

C       Concrete Screed

D  Block and beam floor

Answer explanation

The correct type of floor construction specified by the architect for the new residential building is a Block and beam floor.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

During the construction of a new residential building, who would be responsible for determining the depth of concrete required for the foundations and floor?

A           Quantity Surveyor

B           Structural Engineer

C           Architect

D           Site Surveyor

Answer explanation

The Structural Engineer would be responsible for determining the depth of concrete required for the foundations and floor.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What name is given to the floor construction that is not fixed?

 

A        Suspended

B        Temporary

C          Solid

D         Floating

Answer explanation

The correct name given to the floor construction that is not fixed is 'Floating', making option D the correct choice.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?