BSE UNIT 8 Building Information Modeling Quiz

BSE UNIT 8 Building Information Modeling Quiz

12th Grade

33 Qs

quiz-placeholder

Similar activities

T- Levels BSE Paper 2 Mock Exam

T- Levels BSE Paper 2 Mock Exam

12th Grade

31 Qs

Quiz REV111 _12 November 2024_ 1B&1K

Quiz REV111 _12 November 2024_ 1B&1K

1st Grade - University

36 Qs

L3 YR2 Revision 5 (Electrical)

L3 YR2 Revision 5 (Electrical)

12th Grade

34 Qs

Atenció al client

Atenció al client

1st - 12th Grade

28 Qs

Salon Safety

Salon Safety

9th - 12th Grade

35 Qs

POB Unit 3 and 4

POB Unit 3 and 4

9th - 12th Grade

29 Qs

BSE UNIT 10 LESSON 3 What is a total station?

BSE UNIT 10 LESSON 3 What is a total station?

12th Grade

36 Qs

Plumbing Knowledge Quiz

Plumbing Knowledge Quiz

12th Grade

35 Qs

BSE UNIT 8 Building Information Modeling Quiz

BSE UNIT 8 Building Information Modeling Quiz

Assessment

Quiz

Professional Development

12th Grade

Hard

Created by

Miles Tarplee

Used 1+ times

FREE Resource

33 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does Level 0 BIM represent in Building Information Modeling?

Collaboration using 3D CAD models

No collaboration, using 2D CAD working with drawings

All parties using a common 3D model in a central environment

2D CAD for drafting production information

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which level of BIM involves all parties using 3D CAD models and sharing information through a common file format?

Level 0 BIM

Level 1 BIM

Level 2 BIM

Level 3D BIM

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the characteristic of Level 3D BIM?

Using 2D CAD for drafting without collaboration

Using 2D CAD for drafting with production information

Sharing 3D CAD models without a common file format

All parties use one shared 3D model in a central environment that is accessible and editable by everyone

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does Level 1 BIM involve?

No collaboration and working with 3D models

2D CAD for drafting production information

All parties sharing information through a common file format

A central environment with an open BIM approach

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

As of April 2016, what became a mandatory requirement for all publicly tendered projects in the UK?

Level 1 BIM

Level 2 BIM

Level 3 BIM

Level 4 BIM

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT a reason for using BIM according to the diagram?

Renovation

Cost Estimation

Fabrication

Analysis

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of using small portable imaging scanners and drones during the planning stage?

To provide real-time surveillance

To give access to difficult locations and capture aerial imagery for generating 3D data

To replace traditional surveying methods completely

To create 2D sketches of environments

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?