Les J.O. à Teahupo'o (la Polynésie Française)

Les J.O. à Teahupo'o (la Polynésie Française)

10th Grade

10 Qs

quiz-placeholder

Similar activities

Trabalhin dos guru

Trabalhin dos guru

10th Grade

10 Qs

Los números (0-millón)

Los números (0-millón)

KG - Professional Development

12 Qs

Quiz Katakana Nikuroi

Quiz Katakana Nikuroi

10th - 11th Grade

10 Qs

Japanese adjectives (tango)

Japanese adjectives (tango)

3rd Grade - Professional Development

15 Qs

Articles - the, a, an, Ø

Articles - the, a, an, Ø

8th - 12th Grade

14 Qs

Wiederholung-Essen und Trinken

Wiederholung-Essen und Trinken

10th Grade

10 Qs

Rosetta Stone Spanish Level 1 Unit 1-3 review

Rosetta Stone Spanish Level 1 Unit 1-3 review

6th - 12th Grade

12 Qs

La Nourriture - Expressions

La Nourriture - Expressions

9th - 12th Grade

13 Qs

Les J.O. à Teahupo'o (la Polynésie Française)

Les J.O. à Teahupo'o (la Polynésie Française)

Assessment

Quiz

World Languages

10th Grade

Easy

Created by

Jacob Villafana

Used 2+ times

FREE Resource

AI

Enhance your content

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary reason for the construction of a new judges' tower at the Teahupo'o site?

To increase the height of the tower for better views

To improve the visibility for judges and ensure safety standards

To replace the old tower with a more aesthetically pleasing structure

To accommodate more spectators

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why was the option of using the existing wooden tower and its foundations dismissed?

Due to its historical value

Because it was considered too modern

Due to safety concerns and structural weaknesses

Because it was too tall

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was a major concern regarding the reinforcement of the existing foundations?

Time constraints

Lack of technical expertise

Impact on the coral reef and environmental footprint

The cost of reinforcement

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why was the option of having judges on the shore or on a boat deemed unsuitable?

Because of the lack of technology

Due to legal restrictions

Because of the risk of shark attacks

Due to the distance and visibility issues

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What material was chosen for the construction of the new tower, and why?

Steel, for its strength

Plastic, for its cost-effectiveness

Aluminium, for its durability and resistance

Wood, for its traditional appearance

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What measures are being taken to minimize the environmental impact of the new tower's construction?

Using recycled materials only

Reducing the size and weight of the tower and using a shallower draught barge

Limiting construction to daytime hours

Banning all construction activities

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How will the new foundations for the tower be designed to accommodate the coral environment?

Using floating foundations

By using large-scale excavation

Through drilling and micropiles without large-scale excavation

By completely avoiding the coral areas

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?