103 ppt7 Demolition of Buildings Quiz

103 ppt7 Demolition of Buildings Quiz

1st Grade

37 Qs

quiz-placeholder

Similar activities

Food Groups

Food Groups

1st - 5th Grade

35 Qs

Prelim Exam Hospitality Law

Prelim Exam Hospitality Law

KG - Professional Development

40 Qs

Brick quiz

Brick quiz

1st Grade

37 Qs

Unit 3.2 Self-management skills for young children.

Unit 3.2 Self-management skills for young children.

1st - 8th Grade

35 Qs

Back to School

Back to School

1st - 5th Grade

32 Qs

End of Term Examination 2021 Upper School

End of Term Examination 2021 Upper School

KG - Professional Development

35 Qs

english quiz

english quiz

1st - 5th Grade

35 Qs

OCR Cambridge National ICT LO3

OCR Cambridge National ICT LO3

KG - Professional Development

34 Qs

103 ppt7 Demolition of Buildings Quiz

103 ppt7 Demolition of Buildings Quiz

Assessment

Quiz

Education

1st Grade

Easy

Created by

John Harris

Used 2+ times

FREE Resource

37 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When is planning permission not required for the demolition of a building ?

When the building is more than 50 cubic metres

When the building is less than 50 cubic metres

When the building is located in a conservation area in Wales

When the building is listed

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What must be included in the detailed sequence of work before demolishing a building?

Cost estimation and budget allocation

Isolation of all services and risk assessments and method statements

Notification to the local authorities

Public announcement and safety barriers

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What can be the result of failing to isolate gas, electricity, water supply, and telecommunications services?

Improved efficiency of services

No significant impact

Release of toxic and explosive gases, risk of electrocution, and flooding

Decreased costs in construction

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should risk assessments and method statements include when removing and demolishing a property?

The color scheme of the property

The historical value of the property

Specific risks and hazards associated with the removal and demolition, materials involved, and prevention of debris and contamination

The resale value of the materials involved

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Before any demolition can begin, what environmental aspect needs to be considered?

The cost of demolition

The environmental impact

The time it will take to demolish

The color of the building

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a common practice to prevent dangerous dusts such as asbestos from leaving the site?

Ignoring them

Sealing the site with plastic

Manually removing them

Using water sprays

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What must be safely disconnected to reduce the chance of an explosion during demolition?

Water supplies

Gas supplies

Internet connections

Security systems

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?