Central Heating revision | 6035
Authored by George Harding
Professional Development
Professional Development
Used 355+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
22 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Identify what type of system is shown here.
C plan plus
Semi gravity system
Unvented system
Full gravity pumped system
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
To conform with European standard, all radiators manufacture must comply with:
BS 4422
BS 6700
BS EN 442
BS EN 104
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The type of system shown can be identified as?
W-plan system
S-plan system
Y-plan system
Combination boiler system
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
On a three port mid-position valve, what does port 'A' supply?
The boiler
Central heating circuit
F&E cistern
Hot water circuit
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The most common arrangement of radiator valve is:
BBOE
TBOE
TBSE
TTOE
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The type of radiator shown here is?
Double panel with single convector
Single panel with double convector
Double panel
Single panel with single convector
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Dependant of the skirting, what is the typical height that you should install radiators from floor level?
100mm
150mm
200mm
250mm
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?