Sanitation Checkpoint Test

Sanitation Checkpoint Test

Professional Development

20 Qs

quiz-placeholder

Similar activities

Let' Play

Let' Play

Professional Development

20 Qs

R & I / Repair Track Adjuster & HIC Accumulator PC2000

R & I / Repair Track Adjuster & HIC Accumulator PC2000

Professional Development

20 Qs

PRODUCT KNOWLEDGE DOZER D155A

PRODUCT KNOWLEDGE DOZER D155A

Professional Development

21 Qs

Pre Test Pneumatic

Pre Test Pneumatic

KG - Professional Development

25 Qs

2018 IPC CH 5 Quiz

2018 IPC CH 5 Quiz

Professional Development

25 Qs

Managing Abnormal Operation Condition

Managing Abnormal Operation Condition

1st Grade - Professional Development

15 Qs

April

April

Professional Development

15 Qs

Intermediate Hydraulics Mod 2 Cylinder Appliactions

Intermediate Hydraulics Mod 2 Cylinder Appliactions

Professional Development

15 Qs

Sanitation Checkpoint Test

Sanitation Checkpoint Test

Assessment

Quiz

Other

Professional Development

Medium

Created by

Ian Marriott

Used 4+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where are the statutory requirements for the installation of drainage systems?

BS 6700

BS EN 12056

Building regulations

WRAS

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Identify this type of stack system.

Primary ventilated stack

Secondary ventilated stack

Ventilated discharge branch stack

Stub stack

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If a discharge branch has a gradient of 18mm per metre and the branch is 3 metres in length, what will the vertical drop distance be?

54mm

18mm

36mm

72mm

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What is the purpose of the component shown below, when installed at the base of the stack?

To prevent evaporation

To prevent backflow

To prevent expansion

To prevent compression

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The maximum recommended length of a discharge pipe from a bath connected to a primary ventilated stack is:

3 metres

4 metres

5 metres

6 metres

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the recommended termination, as per building regulations, for a soil stack inside a building?

Open ended

Cowl

Domical cage

Air admittance valve

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the minimum sized waste that is allowed to be fitted to a bidet?

32mm

40mm

50mm

100mm

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?