1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What are sub-assemblies in off-site construction?
Components that are manufactured on-site and used as part of the construction programme
Components that are manufactured off-site and require skilled assembly on-site
Pre-designed architectural models for construction projects
Tools and equipment used for on-site construction work
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is NOT a component that may form sub-assemblies in off-site construction?
I-joists
Paints
Roof systems
Floor systems
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is required for the delivery of sub-assemblies in off-site construction?
Immediate installation upon delivery
Delivery, storage, and skilled assembly as part of the construction programme
No storage or assembly, just direct incorporation into the building
Only storage without the need for skilled assembly
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What are components in off-site construction?
Tools used for on-site construction
Constituent parts of a building made as independent units from one supplier
The main structure of a building
The blueprint and design plans for a building
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is NOT a use for the term 'components' in off-site construction?
Vapour barriers
Cladding
Electrical wiring systems
Curtain walling panels
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is an open system in off-site construction panelised systems?
Insulated, sheeting on both sides and a service zone.
Made with structural elements only, non-insulated, occasionally one side is sheeted.
Variation of closed panels; solid insulation ‘sandwiched’ with two layers of oriented strand board (OSB).
A system that uses glass panels exclusively.
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What characterizes a closed system in off-site construction panelised systems?
Made with structural elements only, non-insulated, occasionally one side is sheeted.
A system that uses glass panels exclusively.
Insulated, sheeting on both sides and a service zone.
Variation of closed panels; solid insulation ‘sandwiched’ with two layers of oriented strand board (OSB).
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?