What is the primary role of surveyors in the context of building and structures design?

Building and Structures Design Quiz

Quiz
•
Education
•
Professional Development
•
Hard

James Jones
FREE Resource
99 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
To design the building's architecture
To take exact measurements and determine property boundaries
To manage the construction workforce
To install building services
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is NOT listed as a learning outcome for the chapter on the built environment life cycle?
Understand the design of buildings and structures
Know the planning process
Learn the cost estimation for construction projects
Know the types and purposes of maintenance of buildings, structures, and installed services
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Why is it important to consider reusing existing buildings and recycling materials from demolished buildings?
To increase the cost of construction
To support a sustainable built environment
To create more jobs in the construction sector
To make the construction process more complex
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the purpose of setting out levels in surveying activities according to Table 3.1?
To calculate the volume of soil and other loose materials
To establish heights and depths of roads in relation to the surrounding landscape
To determine the location of infrastructure elements such as roads, bridges and tunnels
To calculate surface area of ground for drainage requirements
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is a datum as defined in the 'KEY TERMS' section?
A method used to calculate area and volume
A specified angle of slope between two points
A fixed point or height from which reference levels can be taken
A tool used to determine positions on a site
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
According to the 'Surveying principles' section, what is important to ensure about a temporary bench mark (TBM)?
It must be moved regularly to accommodate construction activities.
It should be disturbed by machinery movements as needed.
It must not be disturbed to maintain accurate levels for buildings and structures.
It should be replaced by a permanent structure as soon as possible.
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What can sometimes be used as a datum according to the 'INDUSTRY TIP'?
A temporary bench mark (TBM)
A construction blueprint
An inspection-chamber cover in a road near to the site
A surveying instrument
Create a free account and access millions of resources
Similar Resources on Quizizz
100 questions
Final Exam Review

Quiz
•
Professional Development
100 questions
Basic GK 3

Quiz
•
1st Grade - Professio...
99 questions
TAT VIBHAG-1 QUIZ - 1

Quiz
•
Professional Development
101 questions
Parts of Speech Quiz

Quiz
•
Professional Development
101 questions
CHEMISTRY

Quiz
•
Professional Development
100 questions
GENERAL EDUCATION PURPOSIVE COMMUNICATION

Quiz
•
Professional Development
100 questions
Principles of Learning and Teaching

Quiz
•
Professional Development
100 questions
GED 9 - Mathematics (RMS Key)

Quiz
•
Professional Development
Popular Resources on Quizizz
25 questions
Equations of Circles

Quiz
•
10th - 11th Grade
30 questions
Week 5 Memory Builder 1 (Multiplication and Division Facts)

Quiz
•
9th Grade
33 questions
Unit 3 Summative - Summer School: Immune System

Quiz
•
10th Grade
10 questions
Writing and Identifying Ratios Practice

Quiz
•
5th - 6th Grade
36 questions
Prime and Composite Numbers

Quiz
•
5th Grade
14 questions
Exterior and Interior angles of Polygons

Quiz
•
8th Grade
37 questions
Camp Re-cap Week 1 (no regression)

Quiz
•
9th - 12th Grade
46 questions
Biology Semester 1 Review

Quiz
•
10th Grade