6035DRPPT1Q3

6035DRPPT1Q3

12th Grade

15 Qs

quiz-placeholder

Similar activities

FENCING QUIZ

FENCING QUIZ

9th - 12th Grade

12 Qs

6035DRPPT1Q3

6035DRPPT1Q3

Assessment

Quiz

Architecture

12th Grade

Hard

Created by

William Heron

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How is the gradient maintained when installing strap bosses?

By angling the pipe into the boss

The boss has a built in angle of 2.5 degrees

Putting the boss low

Putting the boss high

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of connection is commonly used for boss branches?

Screwed

Welded

Solvent welded or push fit

Bolted

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be inserted into a strap boss to create a watertight seal?

Collared boss

Hole saw

Pilot drill

Correct sized boss adaptor

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where can a soil stack be located?

Only on external walls

Only within the property

Both A and B

None of the above

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary purpose of a strap boss in a soil stack system?

To increase ventilation

To prevent fire spread

To allow connections for waste pipes

To improve structural integrity

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What do boss branches allow in the soil stack system?

Increased ventilation

Limited number of connections

Structural support

Enhanced drainage

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where are collared bosses commonly used?

External soil stacks

Bathrooms

Kitchens

Basements

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?