Demolition Planning Permission Quiz

Demolition Planning Permission Quiz

Professional Development

33 Qs

quiz-placeholder

Similar activities

COMMON PLUMBING PROCESSES MOCK3

COMMON PLUMBING PROCESSES MOCK3

Professional Development

30 Qs

HOT WATER MOCK B

HOT WATER MOCK B

Professional Development

36 Qs

English idioms :))

English idioms :))

KG - Professional Development

30 Qs

Grammar B1/B2: Negative affixes.

Grammar B1/B2: Negative affixes.

9th Grade - Professional Development

36 Qs

Construction Industry Quiz

Construction Industry Quiz

Professional Development

30 Qs

Montessori Language Development Quiz

Montessori Language Development Quiz

Professional Development

34 Qs

SAS 9B

SAS 9B

Professional Development

30 Qs

Debt

Debt

9th Grade - Professional Development

35 Qs

Demolition Planning Permission Quiz

Demolition Planning Permission Quiz

Assessment

Quiz

Education

Professional Development

Medium

Created by

James Jones

Used 2+ times

FREE Resource

AI

Enhance your content

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

33 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When is planning permission not required for the demolition of a building according to the document?

When the building is more than 100 cubic metres

When the building is less than 50 cubic metres

When the building is located in a conservation area in Wales

When the building is listed

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What must be included in the detailed sequence of work before demolishing a building can commence?

Cost estimation and budget allocation

Isolation of all services and risk assessments and method statements

Notification of local residents

Obtaining construction materials

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What can be the result of failing to isolate gas, electricity, water supply, and telecommunications services?

Improved efficiency of services

Decreased risk of accidents

Release of toxic and explosive gases, risk of electrocution, and flooding

Enhanced communication between operatives

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should risk assessments and method statements include when removing and demolishing a property?

Only the cost of the materials involved

The specific risks and hazards associated, materials involved, and measures to prevent debris and contamination

The color and design of the property

The schedule of the workers involved in the demolition

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Before beginning demolition, what environmental factor must be considered?

The cost of demolition

The environmental impact

The time it will take to demolish

The color of the building

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a common practice to prevent dangerous dusts such as asbestos from leaving the site?

Ignoring it

Sealing the site with plastic

Manually removing the asbestos

Using water sprays

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What must be safely disconnected to reduce the chance of an explosion during demolition?

Water supply

Internet connection

Gas supplies

Alarm systems

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?