PP 8 Installation of Hot Water Pipework

PP 8 Installation of Hot Water Pipework

Professional Development

39 Qs

quiz-placeholder

Similar activities

Casting And Welding

Casting And Welding

Professional Development

40 Qs

Sample e-volve MC Test

Sample e-volve MC Test

Professional Development

40 Qs

ASSESSMENT ELEKTROMEKANIKAL QUIZZ

ASSESSMENT ELEKTROMEKANIKAL QUIZZ

Professional Development

42 Qs

Block 1 - 3

Block 1 - 3

Professional Development

37 Qs

LV08 Chassis A

LV08 Chassis A

Professional Development

34 Qs

Constructions C

Constructions C

Professional Development

39 Qs

HEAT QUIZ 1

HEAT QUIZ 1

Professional Development

37 Qs

GPG APTITUDE TEST

GPG APTITUDE TEST

Professional Development

40 Qs

PP 8 Installation of Hot Water Pipework

PP 8 Installation of Hot Water Pipework

Assessment

Quiz

Physics

Professional Development

Hard

Created by

jon May

FREE Resource

AI

Enhance your content

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

39 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Under which British Standard is the installation of hot water pipework covered?

British Standard 1057

British Standard 8558

British Standard 100°C

British Standard 95°C

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which materials are usually used for hot water pipes and fittings

PVC and rubber

Copper tubes to BS EN 1057 and polybutylene pipes

Steel and iron

Aluminium and zinc

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the maximum temperature that hot water should never be allowed to reach in the pipework?

95°C

100°C

105°C

85°C

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The pipework should be capable of withstanding how many times the normal operating pressure of the system?

One time

One and a half times

Twice

Three times

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How are the installation methods for low pressure hot water systems compared to those for low pressure cold water systems?

Completely different

Very similar

Not related

Only similar in the use of materials

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be ensured when pressure testing open-vented cylinders?

That the temperature is consistent

That the cylinder is fully operational

That the maximum pressure the cylinder can withstand is not exceeded

That the cylinder is disconnected

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done if necessary before pressure testing commences?

The cylinder should be heated up

The cylinder should be disconnected and the pipework capped

The pipework should be replaced

The pressure should be increased

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?