QUIZ WOW 1

QUIZ WOW 1

Professional Development

25 Qs

quiz-placeholder

Similar activities

Brake Fundamentals

Brake Fundamentals

Professional Development

26 Qs

CTE General Safety

CTE General Safety

7th Grade - Professional Development

20 Qs

2018 IPC CH 6A Quiz

2018 IPC CH 6A Quiz

Professional Development

25 Qs

TS vs ATS

TS vs ATS

Professional Development

27 Qs

CPL Acft Tech - Lubrication & cooling systems

CPL Acft Tech - Lubrication & cooling systems

Professional Development

20 Qs

Gen_Tech_FoP_Quiz2

Gen_Tech_FoP_Quiz2

12th Grade - Professional Development

30 Qs

MTS Travel System PC2000

MTS Travel System PC2000

1st Grade - Professional Development

20 Qs

C142

C142

Professional Development

22 Qs

QUIZ WOW 1

QUIZ WOW 1

Assessment

Quiz

Other

Professional Development

Medium

Created by

Amirul MM

Used 13+ times

FREE Resource

25 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Gate valve is type of valve that is used on christmastree to adjust flow of fluid from well.

True

False

Answer explanation

Gate valve for fully isolated

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

PSDV is closed in case of process emergency shutdown condition.

True

False

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

ESDV has delay time 30 second to close after shut down case initiated.

True

False

Answer explanation

ESDV panel don't have delay time facility, directly close after SD system is active

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

SDV stroking test has to be done during process shut down only.

True

False

Answer explanation

stroking test facility can be used, no need SD

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

All ESDV will be closed due to SD 2 on platform.

True

False

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

To prevent back flow, check valve is installed on just right after trunkline ESDV.

True

False

Answer explanation

no check valve, connection on sea line after battery limit (ESDV) is not allowed

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Production manifold PSV replacement has to be done by shut in the well and depressurize the manifold.

True

False

Answer explanation

no PSV on manifold

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?