1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Commissioning is the initial start-up and operation of a PV system.
True
False
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The electrical inspector will make sure that the building codes adopted by the local government are being followed.
True
False
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Conductor insulation on PV systems should be rated for wet locations.
True
False
Tags
NGSS.HS-PS2-5
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The last item to check when performing the final check is signage.
True
False
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Stand-alone PV systems will require less maintenance than grid-tie systems.
True
False
6.
FILL IN THE BLANK QUESTION
1 min • 1 pt
The organization, office, or individual designated by the local government with legal powers to administer, interpret, and enforce building codes is called the ________________.
7.
FILL IN THE BLANK QUESTION
1 min • 1 pt
A maintenance ________________ is a list of maintenance tasks and their suggested time interval.
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?