UEEEL0047 Revision

UEEEL0047 Revision

University

10 Qs

quiz-placeholder

Similar activities

Elements of Mechanical Engineering

Elements of Mechanical Engineering

University

15 Qs

Climate Change Tweet Labeling Practise

Climate Change Tweet Labeling Practise

University

10 Qs

Logistic services (Autonomous Vehicle)

Logistic services (Autonomous Vehicle)

University

10 Qs

Ch 6: Reproduction and Sex-Truth or Myth

Ch 6: Reproduction and Sex-Truth or Myth

University

10 Qs

Final Round

Final Round

University

15 Qs

Digital and analog signals

Digital and analog signals

8th Grade - University

10 Qs

Nuclear Medicine Intro

Nuclear Medicine Intro

University

12 Qs

Nano_Quiz 2

Nano_Quiz 2

University

12 Qs

UEEEL0047 Revision

UEEEL0047 Revision

Assessment

Quiz

Science

University

Practice Problem

Hard

Created by

Jarrod Tebb

Used 2+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Choose all that apply. Anti-islanding means:

It is a type of generator

It is a type of blackout protection

It is a type of electrical protection

It switches of grid-connected generators

2.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Choose all that apply. In a power outage, auto-changeover:

automatically shuts down all circuits

automatically disconnects from the main grid

switches to the backup generator or inverter

switches to power save mode

3.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Choose all that apply. When conducting maintenance on a photovoltaic array, you have to de-energising the solar charge controller because:

Shutting down the system

Electrical shock hazard

A short circuit

Potential damage to the system components

4.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Choose all that apply. Components in photovoltaic (PV) array systems must be replaced like-for-like otherwise:

It can introduce compatibility issues

It can lead to lead to premature wear and tear

It may compromise the built in safety features

It may lead to frequent breakdowns and more maintenance

It may void the warranty on the system

5.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Choose all that apply. Islanding requirements contribute to overall grid reliability. How do they do this?

They prevent potential damage to connected appliances during a power outage

They prevent isolated sections of the grid from continuing to operate independently

They reduce the risk of damage to appliances

They ensure grid stability when power is restored

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Multiple choice. Which of the following is the correct way to conduct an auto disconnect timing test for a solar PV system:

Turn off the normal supply main switch to disconnect the main electricity supply and time how long it takes for the inverter to disconnect- it should disconnect within 2 seconds.

Turn off the normal supply main switch to disconnect the main electricity supply and time how long it takes for the inverter to disconnect- it should disconnect within 30 seconds.

Turn off the normal supply main switch to disconnect the main electricity supply and time how long it takes for the inverter to disconnect- it should disconnect within 2 Minutes.

Turn off the battery supply main switch to disconnect the battery supply and time how long it takes for the inverter to disconnect- it should disconnect within 2 seconds.

7.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Choose all that apply. Electrical drawings often need to be updated after performing maintenance on a PV array system. Why?

Maintenance activities might lead to changes in the actual configuration or layout of the PV array system.

If components such as inverters, modules, or other critical elements are replaced during maintenance, the updated information needs to be reflected in the electrical drawings

Any changes to the wiring layout, connections, or configurations should be documented in the electrical drawings

Upgrades or expansions to the PV array system should be properly incorporated into the electrical drawings

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?