ELEMENTAL COST ANALYSIS

ELEMENTAL COST ANALYSIS

University

10 Qs

quiz-placeholder

Similar activities

Rhythm, Unity, and Character

Rhythm, Unity, and Character

University - Professional Development

12 Qs

Building Laws Quiz 3- PD1096

Building Laws Quiz 3- PD1096

KG - Professional Development

15 Qs

L: SET 1

L: SET 1

University

10 Qs

Building Information Modelling Quiz

Building Information Modelling Quiz

University

14 Qs

ArchDesign Quiz 2

ArchDesign Quiz 2

KG - Professional Development

15 Qs

Quiz on Cladding in Buildings

Quiz on Cladding in Buildings

University

13 Qs

Quiz 2

Quiz 2

University

12 Qs

buildings

buildings

3rd Grade - University

10 Qs

ELEMENTAL COST ANALYSIS

ELEMENTAL COST ANALYSIS

Assessment

Quiz

Architecture

University

Hard

Created by

Nur Aina

Used 2+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the definition of Elemental Cost Analysis?

A systematic breakdown of the cost of a building for a client to determine the cost of each element.

A summary of the total cost of a building project.

A detailed analysis of the structural components of a building.

A breakdown of the cost of labor in a construction project.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why was Elemental Cost Analysis first initiated?

To prepare a summary of the total cost of a building project.

To provide a detailed analysis of the structural components of a building.

To determine the cost of labor in construction projects.

To compare the cost of two similar building types.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of Elemental Cost Analysis preparation?

To serve as a reference for estimating the cost of a proposed building.

To provide a detailed analysis of the structural components of a building.

To prepare a summary of the total cost of a building project.

To determine the cost of labor in construction projects.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What documents are required for the preparation of Elemental Cost Analysis?

Complete contract document, working drawings and specification, tender report.

Building permits, environmental impact assessment, land survey report.

Architectural sketches, material samples, project timeline.

Construction equipment list, safety regulations, project budget.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is Form 2 used for in Elemental Cost Analysis preparation?

Contain summary of the elements cost.

Provide brief picture of the building standard and quality.

List and content of elements.

Systematic breakdown of the cost of elements of a building.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is an important note to consider when using Elemental Cost Analysis for estimation?

Cost Analysis is prepared based on the actual construction progress.

Cost Analysis is used for determining the project timeline.

Cost Analysis is based on the actual sum as in Final Account.

Cost Analysis is not sufficient to determine the actual price.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How can Elemental Cost Analysis be used for decision making?

Provides a detailed breakdown of the structural components of a building.

Used to prepare a summary of the total cost of a building project.

Enables clients and designers to develop ideas on how cost of elements can be allocated and obtain more balance design.

Used to compare the cost of labor in construction projects.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?