APPROXIMATE ESTIMATING TECHNIQUES

APPROXIMATE ESTIMATING TECHNIQUES

University

10 Qs

quiz-placeholder

Similar activities

S5 Architecture Design Process

S5 Architecture Design Process

University

9 Qs

FBC: Introduction to FBC

FBC: Introduction to FBC

University

12 Qs

W: SET 2

W: SET 2

University

10 Qs

Quiz on Construction Materials and Their Properties

Quiz on Construction Materials and Their Properties

University

15 Qs

SPP 200 - Code of Ethics (RA 9266)

SPP 200 - Code of Ethics (RA 9266)

University

10 Qs

Interior Architecture Quiz

Interior Architecture Quiz

University

9 Qs

Quiz on Quantity Surveying

Quiz on Quantity Surveying

University

10 Qs

4) Building Economics and certificates

4) Building Economics and certificates

University

10 Qs

APPROXIMATE ESTIMATING TECHNIQUES

APPROXIMATE ESTIMATING TECHNIQUES

Assessment

Quiz

Architecture

University

Hard

Created by

Nur Aina

Used 2+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the definition of a cost estimate?

A precise calculation of the cost of a proposed project

An approximate calculation of the cost of a proposed project

A final calculation of the cost of a proposed project

A detailed breakdown of the cost of a proposed project

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of a cost estimate in the budgeting process?

To evaluate different design solutions

To set a realistic cost limit for the project

To control the design process

To discourage the client from continuing the project

3.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

How does a cost estimate assist the client in making informed decisions?

By setting the budget for the project

By planning the financing needed for the project

By providing information on the financial scope of the project

By discouraging the client from continuing the project

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main function of a quantity surveyor in relation to cost estimates?

To evaluate different design solutions

To assist the client in achieving cost targets

To design the project

To control the design process

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which method is considered the easiest but most unrefined for cost estimation?

Cubic method

Storey enclosure method

Unit method

Floor area method

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main advantage of the superficial area method for cost estimation?

It requires much time and essential information

It is commonly used and easily understood

It takes into account unique building shapes

It facilitates changes to be done during the design stage

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the approximate quantities method also known as?

Cost plan

Composite items

Rough calculations

Elemental estimate

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?