1.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

Minimum requirements in a geotechnical report often include the following two recommendations:

The overexcavation of all existing soils

.The scarification of all existing surfaces prior to placing any fill

.Removal of all undocumented fill

The placement of fill in lifts no thicker than 12 in.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Expansive soils are often compacted at lower densities and higher moisture.

.True

False

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Pumping or deflection of clayey soils is acceptable in roadway subgrade.

True

.False

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The backscatter method of testing with a nuclear gauge should not be used when testing a thin layer of aggregate base.

True

.False

5.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

Which two conditions are not desirable across a footing bottom?

Dense native soil

Compacted fill contacting bedrock

CL/CH soil at or under optimum

Bedrock

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A caisson was drilled to a depth of 20 ft, and upon completion water had seeped in and filled up 5 ft of the hole; what is not the proper action to take prior to pouring concrete?

Remeasure the hole, and then redrill it to remove slough/sediment if necessary.

Confirm that the contractor will place a tremie to the bottom of the caisson during the pour.

.Pour low-slump concrete from the top of the caisson, making sure to vibrate from the bottom of the hole during the pour.

Calculate the amount of concrete necessary to fill the caisson, with no adjustment made for the 5 ft. of water.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When constructing a rockery wall, the long dimension of the rocks should be perpendicular to the wall face.

.True

False

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?