Safety Gap Closure: Labour Safety 2

Safety Gap Closure: Labour Safety 2

Professional Development

8 Qs

quiz-placeholder

Similar activities

WCA - Food Safety Quiz 1

WCA - Food Safety Quiz 1

9th Grade - Professional Development

11 Qs

Phase4Mod11devices

Phase4Mod11devices

Professional Development

10 Qs

Hoist & Cranes

Hoist & Cranes

Professional Development

5 Qs

Lab Safety

Lab Safety

6th Grade - Professional Development

10 Qs

ACL INJURY

ACL INJURY

Professional Development

10 Qs

Level 1 Tingkahlaku motor

Level 1 Tingkahlaku motor

Professional Development

10 Qs

Telia

Telia

Professional Development

10 Qs

Antenna & Tower Safety

Antenna & Tower Safety

Professional Development

13 Qs

Safety Gap Closure: Labour Safety 2

Safety Gap Closure: Labour Safety 2

Assessment

Quiz

Science

Professional Development

Hard

Created by

Ghadafi Ismail

Used 3+ times

FREE Resource

AI

Enhance your content

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

8 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the fall protection hierarchy?

  1. 1. Eliminate 2. Prevent 3. Restrain 4. Arrest

  1. 1. Elimination 2. Substitution 3. Engineering Control 4. Administrative Control 5. PPE

  1. 1. Absorber 2. Life line 3. Hook 4. Fall arrestor

  1. 1. Arrest 2. Prevent 3. Body Harness 4. Absorber

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

At what minimum height should the 'absorber' harness be worn

>6m

>2m

>1.5m

>8m

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Above what height is required to wear body harness?

>1.5m

>2m

>3m

>4m

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Lifting plan shall be reviewed and discuss with:

Area owner & ENG/ MTCE

Area Owner, ENG/MTCE, SHEQ,

Area Owner, ENG/MTCE, SHEQ, Lifting Supervisor

Area Owner, ENG/MTCE, SHEQ, Lifting Supervisor, Rigger, Signal Man

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Fencing and guarding of rotating equipment is required by

OSHA Act 1994

CLASS Regulation 2013

FMA 1967

Surat Arahan Ketua Pengarah DOSH

6.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

The following personnel is required to conduct crane lifting activity (more than one answer)

Crane operator

Lifting supervisor

Signalman

Rigger

Outrigger

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Based on the given crane chart, determine the suitable boom length of the crane

30.5m

23.5m

16.5m

9.5m

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Calculate the lifting capacity ratio using the given load chart and information given below:

a) Max crane capacity = 25T
b) boom radius = 13m
c) boom length = 23m

d) Total load inlcuding safety factor = 2000kg