U6 SP

U6 SP

12th Grade

15 Qs

quiz-placeholder

Similar activities

Introduction to Architecture

Introduction to Architecture

11th Grade - Professional Development

11 Qs

Building Materials: Lumber

Building Materials: Lumber

10th - 12th Grade

10 Qs

Bolting and Area Concepts

Bolting and Area Concepts

12th Grade

11 Qs

Spring 2024 - Unit 3 Review Quiz (most missed q's)

Spring 2024 - Unit 3 Review Quiz (most missed q's)

9th - 12th Grade

15 Qs

Setting out

Setting out

12th Grade

10 Qs

3D Boxes (Autocad)

3D Boxes (Autocad)

12th Grade

15 Qs

Plans, Specifications, and Codes Quiz

Plans, Specifications, and Codes Quiz

9th - 12th Grade

10 Qs

Lines Used in Architectural Drawing

Lines Used in Architectural Drawing

9th - 12th Grade

10 Qs

U6 SP

U6 SP

Assessment

Quiz

Created by

Umair Syed

Architecture

12th Grade

1 plays

Hard

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of using scale drawings in construction?

To show dimensions and positions

To calculate CO2 emissions

To measure distances accurately

To regulate construction tolerances

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the danger of everyone using different units of measurement in construction?

Component parts will not fit together

Inability to determine quantities of materials for planning and costing

All of the above

Inconsistency will lead to an inability to work with others

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of a laser distance measure in construction?

To calculate the whole life carbon footprint of a building

To obtain precise angular measurements

To monitor the quality of indoor air

To measure distances accurately

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the Imperial measurement system based on?

All of the above

Unusual base items such as barleycorns

Metric system

Objects and varied base items

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the aim of construction tolerances?

To permit deviation from perfect

To measure distances accurately

To regulate CO2 emissions

To monitor the quality of indoor air

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of BS1192 in construction?

To obtain precise angular measurements

To provide a template for common naming conventions

To measure distances accurately

To calculate the whole life carbon footprint of a building

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the danger of under- or overestimating in construction?

Inability to determine quantities of materials for planning and costing

Component parts will not fit together

Inconsistency will lead to an inability to work with others

All of the above

Explore all questions with a free account

or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?