Who should review and approve system deliverables as they are defined and accomplished, to ensure the successful completion and implementation of a new business system application?

AIS51312 C1 Review

Quiz
•
Other
•
University
•
Hard
Marvin Soriano
Used 42+ times
FREE Resource
30 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Project steering committee
Senior management
User management
Quality assurance staff
2.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Which of the following BEST helps to prioritize project activities and determine the timeline for a project?
A Gantt chart
Earned value analysis
Program evaluation review technique
Function point analysis
3.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
An IS auditor reviewing a series of completed projects finds that the implemented functionality often exceeded requirements and most of the projects ran significantly over budget. Which of these areas of the organization’s project management process is the MOST likely cause of this issue?
Project scope management
Project time management
Project risk management
Project procurement management
4.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
An IS auditor is reviewing the software development process for an organization. Which of the following functions are appropriate for the end users to perform?
System configuration
Program output testing
Program logic specification
Performance tuning
5.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
An IS auditor is reviewing system development for a health care organization with two application environments— production and test. During an interview, the auditor notes that production data are used in the test environment to test program changes. What is the MOST significant potential risk from this situation?
The test environment may not have adequate controls to ensure data accuracy.
The test environment may produce inaccurate results due to use of production data.
Hardware in the test environment may not be identical to the production environment..
The test environment may not have adequate access controls implemented to ensure data confidentiality..
6.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
The IS auditor is reviewing a recently completed conversion to a new enterprise resource planning system. In the final stage of the conversion process, the organization ran the old and new systems in parallel for 30 days before allowing the new system to run on its own. What is the MOST significant advantage to the organization by using this strategy?
Significant cost savings over other testing approaches
Assurance that new, faster hardware is compatible with the new system
Assurance that the new system meets functional requirements
Increased resiliency during the parallel processing time
7.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
An organization is replacing a payroll program that it developed in-house, with the relevant subsystem of a commercial enterprise resource planning (ERP)system. Which of the following would represent the HIGHEST potential risk?
Undocumented approval of some project changes
Faulty migration of historical data from the old system to the new system
Incomplete testing of the standard functionality of the ERP subsystem
Duplication of existing payroll permissions on the new ERP subsystem
Create a free account and access millions of resources
Similar Resources on Wayground
25 questions
Engineering Economics - Elements (Exercise 5)

Quiz
•
University
25 questions
Digital Imaging and Design C5 - Color in Digital Media

Quiz
•
9th Grade - University
25 questions
Quiziz No 1 Corporate Governance

Quiz
•
University
27 questions
QAIP

Quiz
•
University
25 questions
BIG DATA

Quiz
•
University
25 questions
UTS SEMINAR AUDIT

Quiz
•
University
25 questions
Form Soal Pre Test Refresh Auditor

Quiz
•
University
35 questions
CMT 210 Midterm Study Guide

Quiz
•
University
Popular Resources on Wayground
25 questions
Equations of Circles

Quiz
•
10th - 11th Grade
30 questions
Week 5 Memory Builder 1 (Multiplication and Division Facts)

Quiz
•
9th Grade
33 questions
Unit 3 Summative - Summer School: Immune System

Quiz
•
10th Grade
10 questions
Writing and Identifying Ratios Practice

Quiz
•
5th - 6th Grade
36 questions
Prime and Composite Numbers

Quiz
•
5th Grade
14 questions
Exterior and Interior angles of Polygons

Quiz
•
8th Grade
37 questions
Camp Re-cap Week 1 (no regression)

Quiz
•
9th - 12th Grade
46 questions
Biology Semester 1 Review

Quiz
•
10th Grade