Wall and ceiling construction -Arch

Wall and ceiling construction -Arch

11th Grade

21 Qs

quiz-placeholder

Similar activities

AutoCAD Review

AutoCAD Review

9th - 12th Grade

20 Qs

Portable Circular Saw Safety and Operations Test

Portable Circular Saw Safety and Operations Test

11th - 12th Grade

19 Qs

Spring 2024 - Unit 2 Review (most missed q's)

Spring 2024 - Unit 2 Review (most missed q's)

9th - 12th Grade

16 Qs

LEVEL ONE - REVIT FUNDAMENTALS

LEVEL ONE - REVIT FUNDAMENTALS

11th - 12th Grade

19 Qs

T1201R-ROOM PLANNING-SLEEPING, BATH, LIVING

T1201R-ROOM PLANNING-SLEEPING, BATH, LIVING

9th - 12th Grade

17 Qs

Commercial Roofs/Walls

Commercial Roofs/Walls

9th - 12th Grade

20 Qs

Ulangan Harian KUG 1

Ulangan Harian KUG 1

11th Grade

20 Qs

Arch 1 - State Test Review - Miscellaneous Quiz

Arch 1 - State Test Review - Miscellaneous Quiz

9th - 12th Grade

22 Qs

Wall and ceiling construction -Arch

Wall and ceiling construction -Arch

Assessment

Quiz

Architecture

11th Grade

Medium

Created by

Sabrina Farrell

Used 8+ times

FREE Resource

AI

Enhance your content

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

21 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Residential wall construction is typically one of three types

ashlar, rubble, combination of both

frame, masonry, combination of both

there is only two types

2.

FILL IN THE BLANK QUESTION

1 min • 1 pt

Frame wall construction consists of

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Douglas fir, southern yellow pine, hemlock, spruce, or plywood sheathing

Wall framing lumber is generally..

Roof materials are generally...

Frame wall construction usually begins with..

Headers are usually...

4.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Moisture level should be between

14%-18%

14-19%

15%-19%

15%-20%

5.

FILL IN THE BLANK QUESTION

1 min • 1 pt

Frame wall construction usually BEGINS with the sole plate, the sole plate is the..

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

8'-1 1/2"

size of ceiling joist

distance from the top of sub floor to the bottom of the ceiling joist

the rough opening height

7.

FILL IN THE BLANK QUESTION

1 min • 1 pt

Each wall opening requires a ______ or ______ to sustain the weight above the opening

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?