Quantity take-off and Cost estimating (Pre-Quiz)
Quiz
•
Architecture
•
Professional Development
•
Medium

Evangeline Ayo-Olalusi
Used 2+ times
FREE Resource
5 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What key documents are required to prepare a construction estimate?
Plans
Specifications
Wage rates
Amendments / Addendum
All of the above
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What costs should be included in a construction estimate?
Materials
Labor
Equipment
Overhead and Profit
All of the above
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is “Quantity Take-off”?
Remove quantities from the project.
Quantification of amount of work to be done.
All of the above
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Some units of measure in estimating include
Square Feet (SF)
Linear Feet (LF)
Cubic Yard (CY)
Eon (E)
A, B, & C
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Some tools for quantity take-off are:
Scale rule
Calculator
Wheelbarrow
Quantity take-off forms
A, B, & D
Similar Resources on Wayground
Popular Resources on Wayground
20 questions
Brand Labels
Quiz
•
5th - 12th Grade
10 questions
Ice Breaker Trivia: Food from Around the World
Quiz
•
3rd - 12th Grade
25 questions
Multiplication Facts
Quiz
•
5th Grade
20 questions
ELA Advisory Review
Quiz
•
7th Grade
15 questions
Subtracting Integers
Quiz
•
7th Grade
22 questions
Adding Integers
Quiz
•
6th Grade
10 questions
Multiplication and Division Unknowns
Quiz
•
3rd Grade
10 questions
Exploring Digital Citizenship Essentials
Interactive video
•
6th - 10th Grade