Electrical capstone prep part 1

Electrical capstone prep part 1

Professional Development

51 Qs

quiz-placeholder

Similar activities

BT (Mock -2 2023)

BT (Mock -2 2023)

Professional Development

47 Qs

Final Review

Final Review

Professional Development

50 Qs

SELASAR WEEK 14

SELASAR WEEK 14

Professional Development

50 Qs

NC Test Prep Unit XIII - Property Valuation & Appraisal (N)

NC Test Prep Unit XIII - Property Valuation & Appraisal (N)

Professional Development

52 Qs

ACS Knowledge Check

ACS Knowledge Check

Professional Development

50 Qs

Financing Progress Exam 4

Financing Progress Exam 4

University - Professional Development

50 Qs

IMI auto LV08 Chassis Diagnotics

IMI auto LV08 Chassis Diagnotics

Professional Development

47 Qs

Financial Counseling Module 3

Financial Counseling Module 3

Professional Development

50 Qs

Electrical capstone prep part 1

Electrical capstone prep part 1

Assessment

Quiz

Professional Development

Professional Development

Easy

Created by

Jenna A

Used 11+ times

FREE Resource

51 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

As the temperature of a conductor increases, its resistance will?

increase

decrease

remain the same

reach a maximum

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A voltmeter connected between points of equal potential will indicate?

a short circuit

a max reading on the meter

a zero reading on the meter

a negative reading

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Using As/NZS3012, at a construction site how are construction wiring systems distinguished or marked from permanent wiring systems?

using sheaths of different colour

iridescent yellow tape spaced not exceeding 5m

marked with the words 'construction wiring'

all of the above

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Using AS/NZS3012 clause 2.6.3

When taking power from temporary construction switchboard, what type of lead should be used?

heavy duty sheath

TPS

any

building wire

5.

FILL IN THE BLANK QUESTION

5 mins • 1 pt

Using AS/NZS3000

What would be the reason for an area being classified as a hazardous area if electrical equipment is to be installed? Provide the clause

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

A likely cause of reported electrical shocks (tingles) from the metallic water system in premises with a MEN earthing system is

an open cct in the neutral conductor supplying the water heater

a short cct to earth of a sub-cct active conductor

a high resistance in consumer's supply neutral conductor

a short cct in a cub-cct protected by a re-wireable fuse

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The maximum resistance of an earth conductor accompanying a sub-mains cct shall be

< or = to 0.5ohm

< or = to 2ohm

< or = to 1Mohm

low enough to permit the passage of current necessary to operate the overcurrent protective device

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?

Discover more resources for Professional Development