Flooring Installation Quiz

Flooring Installation Quiz

12th Grade

9 Qs

quiz-placeholder

Similar activities

Carpentry: ELP - from the book

Carpentry: ELP - from the book

9th - 12th Grade

10 Qs

Prelim, Prime Cost, Prov Sum and Pro Rata

Prelim, Prime Cost, Prov Sum and Pro Rata

9th Grade - University

10 Qs

Engineering Woods

Engineering Woods

10th Grade - University

10 Qs

Timber Care: Tips and Techniques

Timber Care: Tips and Techniques

12th Grade

10 Qs

Exploring Split's Architectural Heritage

Exploring Split's Architectural Heritage

12th Grade - University

9 Qs

FIRE - GROUP 1

FIRE - GROUP 1

12th Grade

10 Qs

Plumbing ripka ch7 213,214

Plumbing ripka ch7 213,214

12th Grade

10 Qs

Think like an architect!

Think like an architect!

12th Grade

8 Qs

Flooring Installation Quiz

Flooring Installation Quiz

Assessment

Quiz

Architecture

12th Grade

Hard

Created by

John Purdum

Used 2+ times

FREE Resource

9 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the original flooring in the foyer area?

Glue down oak strip flooring

Glue down oak parquet flooring

Carpet

Saltillo tile

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why did the owners decide to rip out the oak strip flooring in the living room?

To keep the original flooring

To save money on flooring

To match the flooring in the rest of the house

To install a different type of flooring

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the reason for choosing a different color of the same flooring product?

To save time on delivery

To match the new design of the house

The original color was not available

The original color was out of stock

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What did the pneumatic scraper remove from the concrete slab?

The vinyl flooring

Thinset used for filling holes

The concrete slab itself

Glue from the parquet flooring

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why did the workers scrape and vacuum the floor before installation?

To remove drywall compound and debris

All of the above

To make the floor smoother

To avoid pattern matching issues

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the purpose of using soapy water on a sponge during installation?

To remove excess glue

To lubricate the floor for easier installation

To mark the cutting lines

To clean the floor

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the reason for using a stud pack ram during installation?

To create a pattern on the floor

To measure the floor

To lock the flooring pieces together

To remove excess glue

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the final step before starting the installation of the flooring?

Mixing up thinset and skimming the concrete slab

Cleaning the floor with a vacuum

Cutting the flooring pieces to size

Measuring the hallway for the flooring

9.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the reason for using a vacuum cleaner before the installation of the flooring?

To remove dust and debris

To make the floor smoother

To avoid pattern matching issues

All of the above