REMOVAL EXAMINATION

REMOVAL EXAMINATION

50 Qs

quiz-placeholder

Similar activities

US History Final Review

US History Final Review

8th Grade

49 Qs

Final review CR

Final review CR

7th Grade

45 Qs

Entrepreneurship Chapter 2

Entrepreneurship Chapter 2

KG - University

53 Qs

ICP Final Exam December 2024

ICP Final Exam December 2024

KG - University

46 Qs

Int. Social Studies Final Study Guide 2025

Int. Social Studies Final Study Guide 2025

KG - University

48 Qs

World Civ Final Exam 2025

World Civ Final Exam 2025

KG - University

50 Qs

AMT 3 Midterm Reviewer

AMT 3 Midterm Reviewer

KG - University

55 Qs

REMOVAL EXAMINATION

REMOVAL EXAMINATION

Assessment

Quiz

others

Hard

Created by

Ryan Panapanaan

Used 6+ times

FREE Resource

50 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Building Administrators are compensated based on:
Lump Sum
Percentage of construction cost
Percentage of gross monthly rentals
Percentage of income

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is additional information on contract documents issued to bidders before the date of bidding?
Bid Bulletin
Invitation to Bid
General Condition
Bid Forms

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How are projects classified in determining the basis for the Architect’s Basic Fee?
Material specifications
Total Floor Area
Degree of Project Complexity
Structural Components

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A per diem of not less than______plus traveling and living expenses shall be chargeable to the Owner on any occasion where the Architect of his duly authorized representative shall be required to perform services at a locality beyond the radius of______kilometers from his established office.
P 500.00/ 50 km.
P 500.00/ 100 km.
P 1000.00/ 50 km.
P 1000.00/ 100 km.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following does NOT constitute the post-construction services of the Architect?
post-construction evaluation
building/ equipment maintenance
building/ ground administration
real property evaluation

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

This shall be issued by the Owner to the Contractor following the execution of the Contract Agreement.
Contract Time
Notice to Proceed
Contract Sum Breakdown
Notice to Construct

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

This is the process of dispute resolution operated by the state through the courts.
Arbitration
Mitigation
Litigation
Mediation

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?