6035 Hot Water LO1

6035 Hot Water LO1

Professional Development

13 Qs

quiz-placeholder

Similar activities

Revision - 1st Sem - 2nd Quarter

Revision - 1st Sem - 2nd Quarter

Professional Development

16 Qs

Anatomy of a Paycheck

Anatomy of a Paycheck

Professional Development

16 Qs

Consumer Behaviour  Quiz for FIG Managers

Consumer Behaviour Quiz for FIG Managers

Professional Development

12 Qs

Pop Quiz WB1121

Pop Quiz WB1121

Professional Development

13 Qs

Quiz 9 - JSP_TalentNext

Quiz 9 - JSP_TalentNext

Professional Development

8 Qs

Perform Online Collaboration A

Perform Online Collaboration A

Professional Development

12 Qs

Quiz 1

Quiz 1

Professional Development

10 Qs

Scribble

Scribble

Professional Development

10 Qs

6035 Hot Water LO1

6035 Hot Water LO1

Assessment

Quiz

Professional Development

Professional Development

Medium

Created by

George Harding

Used 325+ times

FREE Resource

13 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which act governs the codes of practice for hot and cold water services?

WRAS

BS6700

BS8000

BS1212

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Define: Instantaneous hot water.

Uses a hot water cylinder, which is heated by a boiler and distributes the hot water.

Uses a CWSC, which distributes the hot water via the cold feed pipe.

Uses a combination boiler, which heats water on demand and distributes the hot water.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Identify: Open vented, indirect gravity fed system.

Media Image
Media Image
Media Image
Media Image

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Identify: Direct hot water cylinder via a boiler.

Media Image
Media Image
Media Image
Media Image

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Statement: BS6700 recommend that the capacity of the CWSC should be at least the same capacity as the cylinder.

True

False

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To prevent parasitic circulation, how long should the pipe from the cylinder be before the connection to the vent pipe is made?

150mm

200mm

450mm

1000mm

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

BS6700 states that which valve should be installed on the vent pipe?

Fullway gate valve

Stop valve

Spherical plug valve

No valve

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?

Discover more resources for Professional Development